Apache stdcxx Incubation Status - Apache Incubator
General
Welcome
Incubator Cookbook
Incubation Policy
Roles and Responsibilities
General FAQ
Incubator Wiki
Who We Are
Status
Project List
Clutch Report
IP Clearance
Entry Guides
Proposal Guide
Podling Guides
Podling Committers
Podling PMC (PPMC)
Podling Mentor
Podling Releases
Podling Branding/Publicity
Podling Websites
Graduation
Retirement
Other Guides
Participation
General FAQ
IPMC Chair
Mailing Lists
Incubator Website
ASF
How Apache Works
Developer Documentation
Foundation
Sponsor Apache
Thanks
Apache stdcxx Incubation Status
This page tracks the incubation status of the stdcxx project.
The stdcxx project graduated on 2007-11-14
Description
The Apache C++ Standard Library project is a complete
implementation of the ISO/IEC 14882 C++ Standard Library.
The most distinguishing characteristic of this
implementation of the C++ Standard Library is its
portability to a large number of C++ compilers, operating
systems, and hardware architectures.
News
11/14/2007 STDCXX graduates into a Top Level Project.
10/29/2007 With
the
approval
of the Incubator PMC, STDCXX 4.2.0 is released.
9/5/2007 STDCXX community adds two new committers, Eric (Brad) Lemings and Mark Brown.
3/26/2007 Tim Triemstra joins the PPMC.
2/13/2007 Andrew Black and Farid Zaripov join the PPMC.
10/11/2006 STDCXX community adds a new committer, Andrew Black.
8/10/2006 STDCXX community adds a new committer, Farid Zaripov.
1/30/2006 With the
approval
of the Incubator PMC STDCXX 4.1.3 was released.
1/13/2006 STDCXX community adds a new committer, Anton Pevtsov.
11/25/2005 Windows configuration and build infarstructure
committed
to Subversion (
STDCXX-5
).
9/16/2005 The first
snapshot
of stdcxx 4.1.2 has been published.
9/5/2005 The test suite driver
committed
to Subversion (
STDCXX-3
).
9/1/2005 A
proposal
to
publish the first stdcxx snapshot on the stdcxx Web site
has passed the community
vote
8/28/2005 The process of downloading stdcxx files
documented on the
page. (
STDCXX-17
).
8/01/2005 The process of reporting bugs in the stdcxx
bug
tracking database
documented and published on the
Bugs
page. (
STDCXX-9
.)
7/19/2005 stdcxx
project
page
and
status
page
committed to subversion.
7/18/2005 stdcxx sources and documentation moved to
subversion
5/19/2005 stdcxx project
accepted
for incubation.
5/13/2005 stdcxx project
proposal
Project Info
item
id
reference
Web site
www
wiki
Wiki not requested.
Mailing lists
dev
stdcxx-dev@incubator.apache.org
user
stdcxx-user@incubator.apache.org
svn
stdcxx-commits@incubator.apache.org
ppmc
stdcxx-ppmc@incubator.apache.org
Moderators
sebor
Martin Sebor
wrowe
William A. Rowe, Jr.
Bug tracking
jira
Source code
svn
Sponsor
Incubator PMC
Mentors
jerenkrantz
Justin Erenkrantz
(See this
post
.)
ben
Ben Laurie
(See this
post
.)
wrowe
William A. Rowe, Jr.
(See this
post
.)
Committers
ablack
Andrew Black
(Rogue Wave)
hbuelow
Heidi Buelow
ldiduck
Lance Diduck
jhollis
John Hollis
(Rogue Wave)
ajindal
Amit Jindal
(self)
lnicoara
Liviu Nicoara
(Rogue Wave)
rpalepu
Ravi Palepu
(Rogue Wave)
antonp
Anton Pevtsov
(VDI)
sebor
Martin Sebor
(Rogue Wave)
ttriemstra
Tim Triemstra
(Apple)
faridz
Farid Zaripov
(EPAM)
mbrown
Mark Brown
elemings
Eric Lemings
(Rogue Wave)
Incubation Status Reports
file
note
2007-11.text
Status report for the calendar quarter ending in November 2007.
2007-08.text
Status report for the calendar quarter ending in August 2007.
2007-05.text
Status report for the calendar quarter ending in May 2007.
2007-02.text
Status report for the calendar quarter ending in February 2007.
2006-11.text
Status report for the calendar quarter ending in November 2006.
2006-08.text
Status report for the calendar quarter ending in August 2006.
2006-04.text
Status report for the calendar quarter ending in April 2006.
2005-12.text
Status report for the calendar quarter ending in December 2005.
2005-09.text
Status report for the calendar quarter ending in September 2005.
Incubation Work Items
Project Setup
Identify the project to be incubated
date
item
N/A
Make sure that the requested project name does not
already exist and
check
NameProtect
to be sure that the name is not already trademarked
for an existing software product.
N/A
If request from an existing Apache project to adopt an
external package, then ask the Apache project for the
cvs module and mail address names.
N/A
If request from outside Apache to enter an existing
Apache project, then post a message to that project
for them to decide on acceptance.
N/A
If request from anywhere to become a stand-alone PMC,
then assess the fit with the ASF, and create the lists
and modules under the incubator address/module names
if accepted.
Interim responsibility
date
item
DONE
Identify all the Mentors for the incubation, by asking
all that can be Mentors.
DONE
Subscribe all Mentors on the pmc and general lists.
DONE
Give all Mentors access to all incubator SVN modules
(to be done by PMC chair).
DONE
Tell Mentors to track progress in the status file.
date
item
DONE
Check and make sure that the papers that transfer
rights to the ASF been received. It is only necessary
to transfer rights for the package, the core code, and
any new code produced by the project.
7/18/2005 - 6/23/2007
Check and make sure that the files that have been
donated have been updated to reflect the new ASF
copyright (
STDCXX-457
).
Verify distribution rights
date
item
DONE
Check and make sure that for all code included with
the distribution that is not under the Apache license,
has the right to combine with Apache-licensed code and
redistribute.
DONE
Check and make sure that all source code distributed
by the project is covered by one or more of the
following approved licenses: Apache, BSD, Artistic,
MIT/X, MIT/W3C, MPL 1.1, or something with essentially
the same terms.
Establish a list of active committers
date
item
7/11/2005
Check that all active committers have submitted a
contributors agreement (see the list of
committers
above for any
exceptions).
7/19/2005
Add all active committers to the status page.
7/16/2005
Ask root to create committers' accounts on
cvs.apache.org (
INFRA-440
).
Infrastructure
date
item
7/16/2005
Ask infrastructure to create source repository modules
and grant the committers karma (
INFRA-441
).
7/13/2005
Ask infrastructure to set up and archive mailing lists
INFRA-339
).
7/16/2005
Decide about and then ask infrastructure to setup an
issue tracking system (
INFRA-438
).
DONE
Migrate the project to our infrastructure.
Project-specific
date
item
8/2/2005 - 8/3/2005
Publish a
page
on
how to file issues against the project and how to
submit patches (
STDCXX-9
).
7/25/2005 - 7/31/2005
Improve the
project
page
STDCXX-6
).
7/25/2005 - 1/18/2006
Make the
Class
Reference
and
Users
Guide
available online, from the project page (
STDCXX-12
).
7/25/2005 - 9/16/2005
Make a tarball of stable project sources available for
download from the project site.
7/25/2005 - ...
Document the design and development practices and
publish them on the project site.
7/25/2005 - ...
Put together a list of things to do and publish it on
the project site.
7/25/2005 - 9/5/2005
Check in the test driver (
STDCXX-3
).
7/25/2005 - ...
Check in the project test suite (
STDCXX-4
).
Incubation
These action items have to be checked for during the whole
incubation process.
These items are not to be signed as done during
incubation, as they may change during incubation.
They are to be looked into and described in the status
reports and completed in the request for incubation
signoff.
Collaborative Development
Have all of the active long-term volunteers been
identified and acknowledged as committers on the
project?
Are there three or more independent committers? (The
legal definition of independent is long and boring, but
basically it means that there is no binding relationship
between the individuals, such as a shared employer, that
is capable of overriding their free will as individuals,
directly or indirectly.)
Are project decisions being made in public by the
committers?
Are the decision-making guidelines published and agreed
to by all of the committers?
Licensing awareness
Are all licensing, trademark, credit issues being taken
care of and acknowleged by all committers?
Project-specific
No project-specific tasks.
Exit
Things to check for before voting the project out.
Organizational acceptance of responsibility for the project
If graduating to an existing PMC, has the PMC voted to
accept it? N/A.
If graduating to a new PMC, has the board voted to
accept it? Yes. See this
post
Incubator sign-off
Has the Incubator decided that the project has
accomplished all of the above tasks? Yes. See the
VOTE RESULT
Copyright © 2009-2026 The Apache Software Foundation