Incidental Take Authorizations for Construction Activities | NOAA Fisheries
Incidental Take Authorizations for Construction Activities
This page lists Incidental Take Authorizations for construction-related activities. Applications are typically posted when public review is initiated.
National
On This Page
Authorizations In Process
Active Authorizations
Withdrawn Authorizations
Expired Authorizations
More Information
An
Interactive Map
can be viewed that shows recent and in process authorizations.
*Please note that to use the Interactive Map, you will be required to log in.
Authorizations In Process
The following authorizations are currently in process:
Francis Scott Key Bridge Rebuild Project in Baltimore, Maryland
Status
Public Comment
Date Issued
Effective Dates
In Process
5/21/2026
--
--
Summary:
NOAA Fisheries has received a request from the Federal Highway Administration (FHWA) for authorization to take marine mammals incidental to the Francis Scott Key (FSK) Bridge Rebuild project in Baltimore, MD. Pursuant to the Marine Mammal Protection Act (MMPA), NOAA Fisheries is requesting comments on its proposal to issue two consecutive incidental harassment authorizations (IHAs) to incidentally take marine mammals during the specified activities. NOAA Fisheries is also requesting comments on possible one-time, 1-year renewals that could be issued under certain circumstances and if all requirements are met. NOAA Fisheries will consider public comments prior to making any final decision on the issuance of the requested MMPA authorization and agency responses will be summarized in the final notice of our decision.
Related Documents
Tradepoint TiL Terminal, LLC's Sparrows Point Container Terminal Project in Baltimore County, MD
Status
Public Comment
Date Issued
Effective Dates
In Process
5/21/2026
--
--
Summary:
NOAA Fisheries has received a request from Tradepoint TiL Terminal, LLC for authorization to take marine mammals incidental to the Sparrows Point Container Terminal Project in Baltimore, MD. NOAA Fisheries is requesting comments on its proposal to issue two consecutive incidental harassment authorizations (IHAs) to incidentally take marine mammals during the specified activities. NOAA Fisheries is also requesting comments on possible one-time, 1-year renewals that could be issued under certain circumstances and if all requirements are met. NOAA Fisheries will consider public comments prior to making any final decision on the issuance of the requested authorization and agency responses will be summarized in the final notice of our decision.
Related Documents
Turnagain Marine Construction's Aak’w Landing Development Project in Juneau, Alaska
Status
Public Comment
Date Issued
Effective Dates
In Process
5/15/2026
--
--
Summary:
NOAA Fisheries has received a request from Turnagain Marine Construction (TMC) for authorization to take marine mammals incidental to the Aak’w Landing Development Project in Juneau, Alaska. NOAA Fisheries is requesting comments on its proposal to issue the requested Incidental Harassment Authorization (IHA). NOAA Fisheries is also requesting comments on a possible one-time, 1-year renewal of the IHA, if issued, under certain circumstances, provided all requirements are met. NOAA Fisheries will consider public comments prior to making any final decision on the issuance of the IHA. Agency responses to substantive public comments received in response to this notice will be summarized in the final notice of our decision.
Related Documents
Port of San Francisco's Mission Bay Ferry Landing Project in San Francisco Bay, CA
Status
Public Comment
Date Issued
Effective Dates
In Process
5/4/2026
--
--
Summary:
NOAA Fisheries has received a request from the Port of San Francisco for authorization to take marine mammals incidental to the Mission Bay Ferry Landing Project in San Francisco Bay, California. NOAA Fisheries is requesting comments on its proposal to issue an incidental harassment authorization to incidentally take marine mammals during the specified activities. NOAA Fisheries is also requesting comments on possible one-time, 1-year renewals for each IHA that could be issued under certain circumstances and if all requirements are met. NOAA Fisheries will consider public comments prior to making any final decision on the issuance of the requested MMPA authorization and agency responses will be summarized in the final notice of our decision.
Related Documents
Modification to United States Coast Guard's Fast Response Cutter Homeporting in Seward and Sitka, Alaska
Status
Public Comment
Date Issued
Effective Dates
In Process
Closed
--
--
Summary:
NOAA Fisheries has received a request from the U.S. Coast Guard to modify an incidental harassment authorization that was issued to the USCG on December 20, 2024, and effective from September 1, 2026, through August 31, 2027, to take small numbers of nine species of marine mammals, by Level A and Level B harassment, incidental to the construction activities associated with fast response cutter homeporting in Sitka, Alaska.
Related Documents
City of Homer's Homer Harbor System Four Float Replacement Project in Homer, Alaska
Status
Public Comment
Date Issued
Effective Dates
In Process
5/4/2026
--
--
Summary:
NOAA Fisheries has received a request from the City of Homer for authorization to take marine mammals incidental to the Homer Harbor System Four Float Replacement Project in Homer, AK. NOAA Fisheries is requesting comments on its proposal to issue an incidental harassment authorization (IHA) to incidentally take marine mammals during the specified activities. NOAA Fisheries is also requesting comments on a possible one-time, 1-year renewal that could be issued under certain circumstances and if all requirements are met. NOAA Fisheries will consider public comments prior to making any final decision on the issuance of the requested authorization and agency responses will be summarized in the final notice of our decision.
Related Documents
Washington State Parks and Recreation Commission’s Marine Facilities Replacement Program in North Puget Sound, Washington
Status
Public Comment
Date Issued
Effective Dates
In Process
4/29/2026
--
--
Summary:
NOAA Fisheries has received a request from the Washington State Parks and Recreation Commission (State Parks) for authorization to take marine mammals incidental to the Marine Facilities Replacement Program in North Puget Sound, Washington, for a period of 5 years from the date of issuance. NOAA Fisheries is announcing receipt of the State Parks’ request for the development and implementation of regulations governing the incidental taking of marine mammals. NOAA Fisheries invites the public to provide information, suggestions, and comments on the State Parks’ application and request.
Related Documents
Bureau of Land Management's Mal Coombs Stairway Replacement Project in Shelter Cove, California
Status
Public Comment
Date Issued
Effective Dates
In Process
4/27/2026
--
--
Summary:
NOAA Fisheries has received a request from the Bureau of Land Management (BLM) for authorization to take marine mammals incidental to the Mal Coombs Stairway Replacement Project in Shelter Cove, California. NOAA Fisheries is requesting comments on its proposal to issue an incidental harassment authorization (IHA) to incidentally take marine mammals during the specified activities. NOAA Fisheries is also requesting comments on a possible one-time, 1-year renewal that could be issued under certain circumstances and if all requirements are met. NOAA Fisheries will consider public comments prior to making any final decision on the issuance of the requested authorization and agency responses will be summarized in the final notice of our decision.
Related Documents
Robert Storrs Harbor Floats A&B Replacement Project in Unalaska, Alaska
Status
Public Comment
Date Issued
Effective Dates
In Process
4/24/2026
--
--
Summary:
NOAA Fisheries has received a request from the City of Unalaska for authorization to take marine mammals incidental to the replacement of the harbor floats in Unalaska, Alaska. NOAA Fisheries is requesting comments on its proposal to issue an incidental harassment authorization (IHA) to incidentally take marine mammals during the specified activities. NOAA Fisheries is also requesting comments on a possible one-time, 1-year renewal that could be issued under certain circumstances and if all requirements are met. NOAA Fisheries will consider public comments prior to making any final decision on the issuance of the requested authorization and agency responses will be summarized in the final notice of our decision.
Related Documents
City of Kodiak's St. Herman Harbor Infrastructure Rebuild Project in the water off of Kodiak, Alaska
Status
Public Comment
Date Issued
Effective Dates
In Process
Closed
--
--
Summary:
NOAA Fisheries has received a request from the City of Kodiak for authorization to take marine mammals incidental to 2 years of construction activities associated with the St. Herman Harbor Infrastructure Rebuild Project in Kodiak, Alaska.
Related Documents
Aleut Corporation's Port of Adak Pier 5 Improvements Project
Status
Public Comment
Date Issued
Effective Dates
In Process
Closed
--
--
Summary:
NOAA Fisheries has received a request from The Aleut Corporation for authorization to take marine mammals incidental to the Port of Adak Pier 5 Improvements Project in Adak Island, Alaska.
Related Documents
United States Army Corps of Engineers' Port Everglades Harbor Navigation Improvement Project in Broward County, Florida
Status
Public Comment
Date Issued
Effective Dates
In Process
Closed
--
--
Summary:
NOAA Fisheries has received a request from the United States Army Corps of Engineers for authorization to take small numbers of marine mammals incidental to the Port Everglades Harbor Navigation Improvement Project in Broward County, Florida over the course of five years from May 2030 through May 2035. NOAA Fisheries is announcing receipt of the USACE’s request for the development and implementation of regulations governing the incidental taking of marine mammals.
Related Documents
Interstate Bridge Replacement Program's Interstate Bridge Replacement Project on Interstate 5 between Portland, Oregon, and Vancouver, Washington
Status
Public Comment
Date Issued
Effective Dates
In Process
Closed
--
--
Summary:
Interstate Bridge Replacement Program applied for authorization to take small numbers of marine mammals incidental to the Interstate Bridge Replacement Project on Interstate 5 between Portland, Oregon, and Vancouver, Washington over the course of 5 years from the date of issuance. NOAA Fisheries is proposing regulations setting forth permissible methods of taking, other means of effecting the least practicable adverse impact on such marine mammal stocks (i.e., mitigation measures), and requirements pertaining to monitoring and reporting such takes and requests comments on the proposed regulations.
Related Documents
U.S. Army Corps of Engineers' Duckabush Estuary Restoration Project near Brinnon, Washington
Status
Public Comment
Date Issued
Effective Dates
In Process
Closed
--
--
Summary:
NOAA Fisheries has received a request from the U.S. Army Corps of Engineers for incidental take regulations and a Letter of Authorization pursuant to the Marine Mammal Protection Act. The requested regulations would govern the authorization of take of small numbers of marine mammals over 5 years (2026-2031) incidental to the Duckabush Estuary Restoration Project in Hood Canal, Washington.
Related Documents
New Fortress Energy, LLC FLNG Project off Louisiana
Status
Public Comment
Date Issued
Effective Dates
In Process
Closed
--
--
Summary:
NOAA Fisheries has received a request from New Fortress Energy Louisiana FLNG, LLC for authorization to take marine mammals incidental to construction of liquefied natural gas platforms off Grand Isle, Louisiana.
Related Documents
Active Authorizations
The following authorizations are currently active:
United States Navy's Demolition of Pier 10 and Construction of a Crane Weight Test Area Project at U.S. Naval Submarine Base New London
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
4/13/2026
--
Summary:
NOAA Fisheries has issued an incidental harassment authorization to the U.S. Navy for authorization to take marine mammals incidental to construction activities during the demolition of Pier 10 and construction of a crane weight test area project at U.S. Naval Submarine Base New London in Groton, Connecticut.
Related Documents
Hampton Roads Connector Partners' Hampton Roads Bridge Tunnel Expansion Project in Norfolk, Virginia
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
3/31/2026
4/1/2026 - 3/31/2027
Summary:
NOAA Fisheries has issued an incidental harassment authorization to Hampton Roads Connector Partners for authorization to take marine mammals incidental to the Hampton Roads Bridge-Tunnel Expansion Project, Norfolk, Virginia.
Related Documents
Renewal of
Pacific Air Forces Regional Support Center's construction activities at Eareckson Air Station Fuel Pier Repair in Alcan Harbor, Shemya Island, Alaska (2025)
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
3/31/2026
4/21/2026 - 4/20/2027
Summary:
NOAA Fisheries has issued a renewal incidental harassment authorization to United States Air Force Pacific Regional Support Center to incidentally harass marine mammals incidental to Eareckson Air Station Fuel Pier Repair in Alcan Harbor on Shemya Island, Alaska.
Related Documents
United States Coast Guard's Homeporting of Offshore Patrol Cutters at Naval Station Newport, Rhode Island
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
3/30/2026
6/1/2027- 5/31/2029
Summary:
NOAA Fisheries has issued two consecutive 1-year incidental harassment authorizations (IHAs) to the United States Coast Guard for authorization to take marine mammals incidental to the Offshore Patrol Cutter (OPC) Homeporting Project at Naval Station Newport, Rhode Island.
Related Documents
United States Navy's Naval Base Point Loma Deperming Pier Replacement Project in San Diego Bay, California
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
3/19/2026
--
Summary:
NOAA Fisheries has issued an incidental harassment authorization (IHA) to the United States Navy for authorization to take marine mammals incidental to the Naval Base Point Loma (NBPL) Deperming Pier Replacement Project in San Diego Bay, California.
Related Documents
United States Navy's Naval Base San Diego Chollas Creek Quay Wall Repair Project in San Diego Bay, California
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
3/19/2026
--
Summary:
NOAA Fisheries has issued an incidental harassment authorization (IHA) to the United States Navy for authorization to take marine mammals incidental to the Naval Base San Diego Chollas Creek Quay Wall Repair Project in San Diego Bay, California.
Related Documents
Alaska Department of Transportation and Public Facilities’ Cold Bay Ferry Terminal Reconstruction Project in Cold Bay, Alaska
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
3/16/2026
5/1/2028 - 4/30/2029
Summary:
NOAA Fisheries has issued an incidental harassment authorization to the Alaska Department of Transportation and Public Facilities for authorization to take marine mammals incidental to the Cold Bay Ferry Terminal Reconstruction Project in Cold Bay, Alaska.
Related Documents
Pacific Gas & Electric's Sediment Remediation Project, Remedial Response Area C in San Francisco Bay
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
2/2/2026
4/6/2026 - 4/5/2027
Summary:
NOAA Fisheries has issued an incidental harassment authorization to Pacific Gas & Electric for authorization to take marine mammals incidental to construction for a sediment remediation project in San Francisco Bay, California.
Related Documents
NOAA Office of Marine and Aviation Operations Research Vessel Relocation at Naval Station Newport in Rhode Island (2026)
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
1/29/2026
2/1/2026 - 1/31/2027
Summary:
NOAA Fisheries has issued an incidental harassment authorization to NOAA Office of Marine and Aviation Operations for authorization to take marine mammals incidental to the research vessel relocation project at Naval Station Newport, Rhode Island.
Related Documents
Ketchikan Dock Company, LLC's Ketchikan Berth IV Expansion Project in Ketchikan, Alaska
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
1/13/2026
2/1/2026 - 1/31/2027
Summary:
NOAA Fisheries has issued an incidental harassment authorization to the Ketchikan Dock Company, LLC for authorization to take marine mammals incidental to construction work for the Ketchikan Berth IV Expansion Project in Ketchikan, Alaska in the East Tongass Narrows.
Related Documents
City & Borough of Yakutat, Alaska's Yakutat Small Boat Harbor Replacement Project in Yakutat, Alaska
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
1/7/2026
--
Summary:
Notification is hereby given that NOAA Fisheries has issued an incidental harassment authorization to the City & Borough of Yakutat, Alaska to incidentally harass marine mammals during construction activities associated with the Yakutat Small Boat Harbor Replacement Project in Yakutat, Alaska.
Related Documents
U.S. Navy's Pier 171 Repair and Replacement Project in Newport, Rhode Island
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
12/9/2025
4/20/2026 - 4/19/2027
Summary:
NOAA Fisheries has issued an incidental harassment authorization to the U.S. Navy for authorization to take marine mammals incidental to construction activities during the Pier 171 Repair and Replacement Project in Newport, Rhode Island.
Related Documents
Washington Department of Transportation's Mukilteo Wingwalls Repair Project in Puget Sound, Washington
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
11/21/2025
1/5/2026 - 1/4/2027
Summary:
NOAA Fisheries has issued an incidental harassment authorization to Washington Department of Transportation for authorization to take marine mammals incidental to the Mukilteo Wingwalls Repair Project in Puget Sound, Washington.
Related Documents
Transcontinental Gas Pipe Line Company, LLC's Northeast Supply Enhancement Project in Raritan Bay, Lower New York Bay, and the Atlantic Ocean
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
9/19/2025
--
Summary:
NOAA Fisheries has issued an incidental harassment authorization to Transcontinental Gas Pipe Line Company, LLC, a subsidiary of Williams Partners L.P., to incidentally harass marine mammals during construction activities associated with the Northeast Supply Enhancement Project in Raritan Bay, Lower New York Bay, and the Atlantic Ocean.
Related Documents
Turnagain Marine Construction's Seward Cruise Ship Passenger Dock and Terminal Facility Project in Seward, Alaska
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
9/5/2025
9/21/2025 - 9/20/2026
Summary:
NOAA Fisheries has issued an incidental harassment authorization to Turnagain Marine Construction for authorization to take marine mammals incidental to Seward Cruise Ship Passenger Dock and Terminal Facility project in Seward, Alaska.
Related Documents
Oregon Department of Transportation’s Yaquina Bay Dolphin Replacement Project in Newport, Oregon
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
9/2/2025
11/1/2025 - 10/31/2026
Summary:
NOAA Fisheries has issued an incidental harassment authorization to the Oregon Department of Transportation for authorization to take marine mammals incidental to construction activities for the Yaquina Bay Dolphin Replacement Project in Newport, Oregon.
Related Documents
Renewal of Phillips 66 Co.'s Ferndale Refinery Dock Maintenance and Pile Replacement Activities in Ferndale, Washington
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
8/8/2025
8/9/2025 - 8/8/2026
Summary:
NOAA Fisheries has issued a renewal incidental harassment authorization to Phillips 66 to incidentally harass marine mammals incidental to Ferndale Refinery Dock Maintenance and Pile Replacement Project Activities in Ferndale, Washington.
Related Documents
Reissuance of Alaska Department of Transportation and Public Facilities Pile Driving and Removal to Improve the Auke Bay East Ferry Terminal in Juneau, Alaska
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
7/30/2025
10/1/2026 - 9/30/2027
Summary:
NOAA Fisheries has received a request from the Alaska Department of Transportation and Public Facilities for the reissuance of a previously issued incidental harassment authorization with the only change being effective dates. The initial IHA authorized take of eleven species of marine mammals, by harassment only, incidental to construction activities associated with the Auke Bay East Ferry Terminal in Juneau, Alaska. The project has been delayed and none of the work associated with the initial IHA has been conducted. The initial IHA was effective from October 1, 2024 through September 30, 2025. ADOT&PF has requested reissuance with new effective dates of October 1, 2026 through September 30, 2027. The scope of the activities and anticipated effects remain the same, authorized take numbers are not changed, and the required mitigation, monitoring, and reporting remains the same as included in the initial IHA. NOAA Fisheries is, therefore, issuing a second identical IHA to cover the incidental take analyzed and authorized in the initial IHA.
Related Documents
U.S. Army Corps of Engineers' Sand Island Pile Dikes Repairs in the Columbia River
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
7/25/2025
8/1/2025 - 7/31/2026
Summary:
NOAA Fisheries has issued an incidental harassment authorization to the U.S. Army Corps of Engineers for authorization to take marine mammals incidental to the Sand Island Pile Dike Repairs Project in the Mouth of the Columbia River.
Related Documents
Washington State Department of Transportation's Kingston Ferry Terminal Trestle Seismic Retrofit Project in Kingston, Washington
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
7/25/2025
9/3/2025 - 9/2/2026
Summary:
NOAA Fisheries has issued an incidental harassment authorization to Washington Department of Transportation for authorization to take marine mammals incidental to harass marine mammals during construction activities associated with a Kingston Ferry Terminal project in Kingston, WA.
Related Documents
Renewal of Ag Processing Inc.'s Port of Grays Harbor Terminal 4 Expansion and Redevelopment Project in Project in Grays Harbor County, Washington
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
7/18/2025
7/18/2025 - 7/15/2026
Summary:
NOAA Fisheries has issued a renewal IHA to the Port of Grays Harbor for authorization to take marine mammals incidental to construction activities associated with the Terminal 4 Expansion and Redevelopment Project at the Port of Grays Harbor in Grays Harbor County, Washington.
Related Documents
Alaska Department of Transportation and Public Facilities' Prince William Sound Ferry Terminal Improvement Projects in Cordova, Chenega, and Tatitlek, Alaska
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
7/25/2025
--
Summary:
NOAA Fisheries has issued three incidental harassment authorizations to the Alaska Department of Transportation and Public Facilities for authorization to take marine mammals incidental to the Prince William Sound Ferry Terminal Improvement Projects in Cordova, Chenega, and Tatitlek, Alaska.
Related Documents
Reissuance of Alaska Department of Transportation and Public Facilities Hydaburg Seaplane Base Refurbishment Project in Hydaburg, Alaska
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
7/17/2025
7/17/2026 - 7/16/2027
Summary:
NOAA Fisheries has received a request from the Alaska Department of Transportation and Public Facilities for the re-issuance of a previously issued incidental harassment authorization with the only change being effective dates. The initial IHA authorized take of nine species of marine mammals by Level A and Level B harassment incidental to construction associated with the Hydaburg Seaplane Base Refurbishment Project in Hydaburg, Alaska. The project has been delayed and none of the work covered in the initial IHA has been conducted. The scope of the activities and anticipated effects remain the same, authorized take numbers are not changed, and the required mitigation, monitoring, and reporting remains the same as included in the initial IHA. NOAA Fisheries is, therefore, issuing a second identical IHA to cover the incidental take analyzed and authorized in the initial IHA.
Related Documents
City of Whittier’s Whittier Harbor Rebuild Phase III Project in Whittier, Alaska
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
7/17/2025
9/16/2025 - 9/15/2026
Summary:
NOAA Fisheries has issued an incidental harassment authorization to the City of Whittier for authorization to take marine mammals incidental to the Whittier Harbor Rebuild Phase III Project in Whittier, Alaska.
Related Documents
Port of Alaska's Construction Activities for the Port of Alaska Modernization Program Phase 2B: Cargo Terminal Replacement Project in Anchorage, Alaska
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
8/15/2025
3/1/2026 - 2/28/2031
Summary:
NOAA Fisheries has issued a Letter of Authorization to the Don Young Port of Alaska, for the unintentional taking of marine mammals incidental to the Cargo Terminals Replacement project at the existing port facility in Anchorage, Alaska over the course of 5 years (2026 – 2031).
Related Documents
City of Ketchikan's Berth III Mooring Dolphins Project in the Port of Ketchikan in the Tongass Narrows, Alaska
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
6/26/2025
--
Summary:
NOAA Fisheries has issued an incidental harassment authorization to the City of Ketchikan for authorization to take marine mammals incidental to the Berth III Mooring Dolphins Project in the Port of Ketchikan in the Tongass Narrows, Alaska.
Related Documents
Alaska Department of Transportation and Public Facilities' Angoon Ferry Terminal Modification Project in Angoon, Alaska
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
6/5/2025
--
Summary:
NOAA Fisheries has issued an incidental harassment authorization to Alaska Department of Transportation and Public Facilities for authorization to take marine mammals incidental to the Angoon Ferry Terminal Modification Project in Angoon, Alaska.
Related Documents
Alaska Railroad Corporation's Seward Freight Dock construction project in Seward, Alaska
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
5/15/2025
11/1/2026 - 10/31/2027
Summary:
NOAA Fisheries has issued an incidental harassment authorization to the Alaska Railroad Corporation for authorization to take marine mammals incidental to Seward Freight Dock construction project in Seward, Alaska.
Related Documents
Haines Borough's Lutak Dock Replacement Project in Haines, Alaska
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
2/9/2024
6/1/2025 - 5/31/2026
Summary:
NOAA Fisheries has received a request from the Haines Borough for the reissuance of a previously issued incidental harassment authorization with the only change being effective dates. The initial IHA authorized take of six species of marine mammals, by Level A and Level B harassment, incidental to construction activities associated with the Lutak Dock Replacement project in Haines, Alaska. The project has been delayed by 1 year and none of the work covered in the initial IHA has been conducted. The initial IHA was effective from June 1, 2024 through May 31, 2025. The Haines Borough has requested reissuance with new effective dates of June 1, 2025 through May 31, 2026. The scope of the activities and anticipated effects remain the same, authorized take numbers are not changed, and the required mitigation, monitoring, and reporting remains the same as included in the initial IHA. NOAA Fisheries is, therefore, issuing a second identical IHA to cover the incidental take analyzed and authorized in the initial IHA.
Related Documents
United States Coast Guard's Base Kodiak Homeporting Facility in Kodiak, Alaska
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
5/13/2025
5/19/2025 - 5/18/2027
Summary:
NOAA Fisheries has issued two consecutive incidental harassment authorizations to the United States Coast Guard for authorization to take marine mammals incidental to Base Kodiak Homeporting Facility in Womens Bay, Kodiak, Alaska.
Related Documents
U.S. Army Corps of Engineers' Lower Columbia River Dredged Material Management Plan, Oregon and Washington
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
6/18/2025
11/1/2027 - 2/29/2032
Summary:
A Letter of Authorization has been issued to the United States Army Corps of Engineers for the taking of marine mammals incidental to the implementation of the Lower Columbia River Dredged Material Management Plan in Oregon and Washington.
Related Documents
Reissue of United States Navy's Maintenance and Pile Replacement Project in Puget Sound, Washington
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
4/15/2025
7/1/2025 - 6/30/2026
Summary:
NOAA Fisheries has received a request from the United States Navy for the re-issuance of a previously issued incidental harassment authorization with the only change being effective dates. The initial IHA authorized take of 10 species of marine mammals, by Level A and Level B harassment, incidental to construction associated with the Navy’s Naval Facilities Engineering Command Northwest Northwest Marine Structure Program project in Puget Sound, Washington. The project has been delayed and none of the work covered in the initial IHA has been conducted. The scope of the activities and anticipated effects remain the same, authorized take numbers are not changed, and the required mitigation, monitoring, and reporting remains the same as included in the initial IHA. NOAA Fisheries is, therefore, issuing a second identical IHA to cover the incidental take analyzed and authorized in the initial IHA.
Related Documents
U.S. Coast Guard's Station Siuslaw River Construction Project in Florence, Oregon
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
3/19/2025
11/1/2025 -10/31/2026
Summary:
NOAA Fisheries has issued an Incidental Harassment Authorization to the U.S. Coast Guard to incidentally harass marine mammals during pile driving activities associated with Station Siuslaw River construction project in Florence, Oregon.
Related Documents
City of Hoonah’s Cargo Dock Project in Hoonah, Alaska
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
3/10/2025
9/1/2025 - 8/31/2026
Summary:
NOAA Fisheries has issued an incidental harassment authorization to the City of Hoonah (Hoonah) to incidentally harass marine mammals during pile driving and removal activities associated with the Hoonah Cargo Dock project in Hoonah, Alaska. There are no changes from the proposed authorization in this final authorization.
Related Documents
Reissuance of United States Navy's Construction at U.S. Naval Submarine Base New London in Groton, Connecticut
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
1/15/2025
2/1/2026 - 1/31/2027
Summary:
NOAA Fisheries has received a request from the U.S. Navy for the re-issuance of a previously issued incidental harassment authorization with the only change being effective dates. The initial IHA authorized take of six species of marine mammals, by Level B harassment, and for take of harbor seals, gray seals, and harp seals by Level A harassment, incidental to construction associated with the New London Pier Extension Project at the Naval Submarine Base New London in Groton, Connecticut. The project has been delayed and none of the work covered in the initial IHA has been conducted. The scope of the activities and anticipated effects remain the same, authorized take numbers are not changed, and the required mitigation, monitoring, and reporting remains the same as included in the initial IHA. NOAA Fisheries is, therefore, issuing a second identical IHA to cover the incidental take analyzed and authorized in the initial IHA.
Related Documents
U.S. Navy's Construction Activities at the Q8 Bulkhead at Naval Station Norfolk in Norfolk, Virginia
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
6/10/2025
8/4/2025 - 8/3/2030
Summary:
A Letter of Authorization has been issued to the U.S. Navy for the take of marine mammals incidental to the Q8 Bulkhead repair and replacement project at Naval Station Norfolk in Norfolk, Virginia.
Related Documents
United States Coast Guard's Fast Response Cutter Homeporting in Seward and Sitka, Alaska
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
12/17/2024
9/1/2026 - 2/29/2028
Summary:
NOAA Fisheries has issued two incidental harassment authorizations to the United States Coast Guard to incidentally harass marine mammals during construction activities associated with fast response cutter homeporting in Seward and Sitka, Alaska.
Related Documents
Renewal of Pacific Gas & Electric's Sediment Remediation Project, San Francisco Bay
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
11/15/2024
5/1/2025 - 4/30/2026
Summary:
NOAA Fisheries has issued a renewal incidental harassment authorization to Pacific Gas & Electric to incidentally harass marine mammals incidental to construction associated with a sediment remediation project in San Francisco Bay, CA.
Related Documents
Reissuance of Alaska Department of Transportation and Public Facilities' Ferry Berth Construction Tongass Narrows Project (2024)
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
11/5/2024
9/1/2025 - 8/31/2026
Summary:
NOAA Fisheries has received a request from the Alaska Department of Transportation and Public Facilities for the re-issuance of a previously issued incidental harassment authorization with the only change being effective dates. The initial IHA authorized take of 11 species of marine mammals, by Level A and Level B harassment, incidental to construction associated with the Ferry Berth construction Ketchikan, Alaska. The project has been delayed and none of the work covered in the initial IHA has been conducted. The scope of the activities and anticipated effects remain the same, authorized take numbers are not changed, and the required mitigation, monitoring, and reporting remains the same as included in the initial IHA. NOAA Fisheries is, therefore, issuing a second identical IHA to cover the incidental take analyzed and authorized in the initial IHA.
Related Documents
Reissuance of City of Santa Cruz Murray St. Bridge Seismic Retrofit Project in Santa Cruz, California
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
9/26/2024
7/1/2025 - 6/30/2027
Summary:
NOAA Fisheries has received a request from the City of Santa Cruz for the reissuance of previously issued incidental harassment authorizations (IHAs). The initial IHAs authorized take incidental to construction associated with Murray St. Bridge seismic retrofit project in Santa Cruz, California. The project has been delayed and none of the planned work has been conducted. The scope of the activities and anticipated effects remain the same, authorized take numbers are not changed, and the required mitigation, monitoring, and reporting remains the same as included in the initial IHAs. NOAA Fisheries therefor is reissuing identical IHAs, with the only change being to the effective dates.
Related Documents
Army Corps of Engineers' Baker Bay Pile Dike Repair Project in Baker Bay, Oregon
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
9/24/2024
8/1/2025 - 7/31/2026
Summary:
NOAA Fisheries has issued an incidental harassment authorization to the Army Corps of Engineers to incidentally harass marine mammals during construction activities associated with the Baker Bay pile dike repair project in Baker Bay, Oregon. There are no changes from the proposed authorization in this final authorization.
Related Documents
Petrogas Pacific, LLC's Ferndale Pier Maintenance Activities in Ferndale, Washington
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
9/4/2024
8/1/2025 - 7/31/2026
Summary:
NOAA Fisheries has issued an incidental harassment authorization to Petrogas Pacific, LLC to incidentally harass marine mammals during construction activities associated with Ferndale Pier Maintenance Activities in Ferndale, Washington.
Related Documents
Weyerhaeuser Company's Log Export Dock Project on the Columbia River near Longview, Washington
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
8/2/2024
9/1/2025 - 8/31/2026
Summary:
NOAA Fisheries has issued an incidental harassment authorization to Weyerhaeuser Company to incidentally harass marine mammals during construction activities associated with the Log Export Dock Project on the Columbia River near Longview, Washington. There are no changes from the proposed authorization in this final authorization.
Related Documents
United States Navy's Maintenance and Pile Replacement Project in Puget Sound, Washington
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
5/28/2024
7/1/2024 - 6/30/2026
Summary:
NOAA Fisheries has issued an incidental harassment authorization to the United States Navy to incidentally harass marine mammals during construction activities associated with the Naval Facilities Engineering Command Northwest Maintenance and Pile Replacement project in Puget Sound, Washington.
Related Documents
City and Borough of Sitka's Seaplane Base Construction Activities
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
5/3/2024
7/1/2024 - 6/30/2026
Summary:
NOAA Fisheries has issued two consecutive incidental harassment authorizations to City and Borough of Sitka to incidentally harass marine mammals during construction activities associated with the CBS’ Sitka Seaplane Base project, in Sitka, Alaska
Related Documents
U.S. Army Corps of Engineers' Port of Nome Modification Project in Nome, Alaska
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
4/17/2024
5/1/2025 - 4/30/2026
Summary:
NOAA Fisheries has received a request from the U.S. Army Corps of Engineers for the reissuance of a previously issued incidental harassment authorization (IHA) with the only change being effective dates. The initial IHA authorized take of 10 species of marine mammals, by Level B harassment only, incidental to construction activities associated with the Port of Nome Modification Project in Nome, Alaska. The project has been delayed by 1 year and none of the work covered in the initial IHA has been conducted. The initial IHA was effective from May 1, 2024 through April 30, 2025. U.S. Army Corps of Engineers has requested reissuance with new effective dates of May 1, 2025 through April 30, 2026. The scope of the activities and anticipated effects remain the same, authorized take numbers are not changed, and the required mitigation, monitoring, and reporting remains the same as included in the initial IHA. NOAA Fisheries is, therefore, issuing a second identical IHA to cover the incidental take analyzed and authorized in the initial IHA.
Related Documents
Naval Magazine Indian Island Ammunition Wharf Maintenance and Pile Replacement Project
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
1/23/2024
10/1/2024 - 9/30/2029
Summary:
NOAA Fisheries, upon request from the U.S. Navy, issues these regulations to govern the taking of marine mammals during the maintenance and pile replacement construction activities at the Ammunition Wharf at Naval Magazine Indian Island in Puget Sound, Washington, over the course of 5 years (2024 to 2029). These regulations, which allow for the issuance of Letters of Authorization for the incidental take of marine mammals during the described activities and timeframes, prescribe the permissible methods of taking and other means of effecting the least practicable adverse impact on marine mammal species and their habitat, and establish requirements pertaining to the monitoring and reporting of such taking.
Related Documents
U.S. Coast Guard Programmatic Maintenance at 8 Facilities in Alaska
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
12/20/2024
3/1/2024 - 2/28/2029
Summary:
NOAA Fisheries, upon request from the United States Coast Guard, hereby issues regulations to govern the unintentional taking of marine mammals incidental to maintenance and repair at facilities in Alaska, over the course of 5 years (2023-2028). These regulations, which allow for the issuance of a Letter of Authorization for the incidental take of marine mammals during the described activities and specified timeframes, prescribe the permissible methods of taking and other means of effecting the least practicable adverse impact on marine mammal species or stocks and their habitat, as well as requirements pertaining to the monitoring and reporting of such taking.
Related Documents
U.S. Navy Replacement of Pier 3 at Naval Station Norfolk in Norfolk, Virginia (2022)
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
5/9/2023
5/18/2023 - 5/18/2028
Summary:
NOAA Fisheries, upon request from the U.S. Navy, hereby issues regulations to govern the unintentional taking of marine mammals incidental to construction activities associated with the replacement of Pier 3 at Naval Station Norfolk in Norfolk, Virginia over the course of 5 years (2023-2028). These regulations, which allow for the issuance of a Letter of Authorization for the incidental take of marine mammals during the described activities and specified timeframes, prescribe the permissible methods of taking and other means of effecting the least practicable adverse impact on marine mammal species or stocks and their habitat, as well as requirements pertaining to the monitoring and reporting of such taking.
Related Documents
U.S. Navy Construction at Portsmouth Naval Shipyard, Kittery, Maine (2023)
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
4/1/2023
4/1/2023 - 3/31/2028
Summary:
NOAA Fisheries, upon request from the U.S. Navy, issued regulations to govern the unintentional taking of marine mammals incidental to construction at the Portsmouth Naval Shipyard in Kittery, Maine, over the course of 5 years (2023-2028). These regulations, which allow for the issuance of a Letter of Authorization for the incidental take of marine mammals during the described activities and specified timeframes, prescribe the permissible methods of taking and other means of effecting the least practicable adverse impact on marine mammal species or stocks and their habitat, as well as requirements pertaining to the monitoring and reporting of such taking.
Related Documents
Modification to U.S. Navy Construction at Naval Station Newport, Rhode Island
Status
Public Comment
Issued Date
Effective Dates
Active
Closed
01/25/2023
01/25/2023 - 05/14/2027
Summary:
NOAA Fisheries has issued a modified Letter of Authorization to the U.S. Navy to incidentally harass, by Level B harassment only, marine mammals during construction activities associated with pile driving and bulkhead repair at Naval Station Newport in Newport, Rhode Island.
Related Documents
Sonoma County Water Agency's Estuary Management Activities in Sonoma County, California (2022)
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
4/19/2022
4/21/2022 - 4/20/2027
Summary:
NOAA Fisheries, upon request from the Sonoma County Water Agency, has issued regulations to govern the unintentional taking of marine mammals incidental to Russian River estuary management activities in Sonoma County, California, over the course of five years (2022-2027). These regulations, which allow for the issuance of Letters of Authorization for the incidental take of marine mammals during the described activities and specified timeframes, prescribe the permissible methods of taking and other means of effecting the least practicable adverse impact on marine mammal species or stocks and their habitat, as well as requirements pertaining to the monitoring and reporting of such taking.
Related Documents
BNSF Railway Railway Bridge Heavy Maintenance Project in King County, Washington
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
11/12/2024
7/16/2025 - 7/15/2027
Summary:
NOAA Fisheries has received a request from BNSF Railway for the reissuance of two consecutive previously issued incidental harassment authorizations with the only change being effective dates. The initial IHAs authorized take of seven species of marine mammals incidental to construction associated with the BNSF Railway Bridge Heavy Maintenance Project.
Related Documents
Lighthouse Repair and Tour Operations at Northwest Seal Rock, California
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
4/15/2022
5/15/2022 - 5/14/2027
Summary:
NOAA Fisheries Office of Protected Resources, upon request from the St. George Reef Lighthouse Preservation Society, has issued regulations to govern the unintentional taking of marine mammals incidental to conducting aircraft operations, lighthouse renovation, light maintenance activities, and tour operations on the St. George Reef Lighthouse Station on Northwest Seal Rock over the course of five years (2022-2027). These regulations, which allow for the issuance of Letters of Authorization for the incidental take of marine mammals during the described activities and specified timeframes, prescribe the permissible methods of taking and other means of effecting the least practicable adverse impact on marine mammal species or stocks and their habitat, as well as requirements pertaining to the monitoring and reporting of such taking. We are also issuing a Letter of Authorization to cover the first year of these activities.
Related Documents
U.S. Navy Construction at Naval Station Newport, Rhode Island
Status
Public Comment
Issued Date
Effective Dates
Active
Closed
12/15/2021
5/15/2022 - 5/14/2027
Summary:
NOAA Fisheries, upon request of the U.S. Navy (Navy), has issued regulations to govern the unintentional taking of marine mammals incidental to construction activities for bulkhead replacement and repairs at Naval Station Newport over the course of five years (2022-2027). These regulations, which allow for the issuance of a Letter of Authorization for the incidental take of marine mammals during the described activities and specified timeframes, prescribe the permissible methods of taking and other means of effecting the least practicable adverse impact on marine mammal species or stocks and their habitat, as well as requirements pertaining to the monitoring and reporting of such taking.
Related Documents
U.S. Navy Construction at Naval Station Norfolk in Norfolk, Virginia
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
5/6/2021
6/7/2021 - 6/6/2026
Summary:
NOAA Fisheries has issued a Letter of Authorization to the U.S. Navy for the take of marine mammals incidental to construction activities at Naval Station Norfolk in Norfolk, Virginia.
Related Documents
Hampton Roads Bridge-Tunnel Expansion Project, Hampton-Norfolk, Virginia (2021-2026)
Status
Public Comment
Date Issued
Effective Dates
Active
Closed
4/2/2021
4/2/2021 - 4/2/2026
Summary:
NOAA Fisheries, upon request of the Hampton Roads Connector Partners, had issued regulations to govern the unintentional taking of marine mammals incidental to construction activities associated with the Hampton Roads Bridge Tunnel Expansion Project in Norfolk, Virginia, over the course of five years (2021-2026). These regulations, which allow for the issuance of Letters of Authorization for the incidental take of marine mammals during the described activities and specified timeframes, prescribe the permissible methods of taking and other means of effecting the least practicable adverse impact on marine mammal species or stocks and their habitat, as well as requirements pertaining to the monitoring and reporting of such taking.
Related Documents
Withdrawn Authorizations
The following authorizations were withdrawn.
Applicant
Activity
Authorization Type
Effective Dates
San Francisco
Treasure Island Ferry Dock
IHA
--
Caltrans
Murray Street Bridge Seismic Retrofit Project, Santa Cruz, California
IHA
--
Municipality of Skagway (AK)
Skagway Gateway Initiative Project
IHA
--
Expired Authorizations
For documents related to expired authorizations, including older authorizations not shown on this page, please contact us.
Applicant
Activity
Authorization Type
Effective Dates
Pacific Air Forces Regional Support Center
Construction activities at Eareckson Air Station Fuel Pier Repair in Alcan Harbor, Shemya Island, Alaska (2025)
IHA
4/21/2025 - 4/20/2026
Maine Department of Transportation
Lubec Harbor Project
IHA
4/11/2025 - 4/10/2026
U.S. Army Corps of Engineers
Reissuance of Unalaska (Dutch Harbor) Channel Deepening Project in Unalaska, Alaska
IHA
3/15/2025 - 3/14/2026
Trident Seafoods' Corporation
Reissuance of Bunkhouse Dock Replacement Project in Alaska
IHA
3/1/2025 - 2/28/2026
NOAA Office of Marine and Aviation Operations
Renewal of Research Vessel Relocation at Naval Station Newport in Rhode Island
IHA
2/27/2025 - 1/31/2026
San Mateo County Harbor District
Pillar Point Harbor Johnson Pier Expansion and Dock Replacement Project in Princeton, California
IHA
12/1/2024 - 11/30/2025
City and Borough of Sitka
Gary Paxton Industrial Park Vessel Haulout Project in Sitka, Alaska
IHA
11/15/2024 - 11/14/2025
Municipality of Skagway
Renewal of Skagway Ore Terminal Redevelopment Project in Skagway, Alaska
IHA
11/18/2024 - 9/30/2025
Port of Bellingham
Renewal of Bellingham Shipping Terminal in Bellingham, Washington
IHA
11/7/2024 - 11/7/2025
U.S. Navy
Renewal of Naval Base Point Loma Pier 302 Replacement Project in San Diego, California
IHA
10/21/2024 - 9/30/2025
Pacific Gas & Electric
Sediment Remediation Project, San Francisco Bay
IHA
5/1/2024 - 4/30/2025
Alaska Department of Transportation and Public Facilities
Pile Driving and Removal to Improve the Auke Bay East Ferry Terminal in Juneau, Alaska
IHA
10/1/2024 - 9/30/2025
U.S. Army Corps of Engineers
Tillamook South Jetty Repairs in Tillamook Bay, Oregon
IHA
11/1/2023 - 10/31/2025
City of Cordova
Harbor Rebuild Project in Cordova, Alaska
IHA
10/1/2023 - 9/30/2025
Washington Department of Transportation
Seattle Slip 3 Vehicle Transfer Span Project off of Seattle, Washington
IHA
9/12/2024 - 9/11/2025
Phillips 66 Co.
Ferndale Refinery Dock Maintenance and Pile Replacement Activities in Ferndale, Washington
IHA
8/9/2024 - 8/8/2025
U.S. Army Corps of Engineers
Sand Island Pile Dikes Repairs in the Columbia River
IHA
8/1/2023 - 7/31/2025
U.S. Coast Guard
U.S. Coast Guard Air Station Port Angeles' Pier Maintenance and Bank Stabilization in Port Angeles, WA
IHA
7/16/2024 - 7/15/2025
Ag Processing Inc.
Port of Grays Harbor Terminal 4 Expansion and Redevelopment Project in Project in Grays Harbor County, Washington
IHA
7/16/2024 - 7/15/2025
U.S. Army Corps of Engineers
Renewal of Debris Dock Replacement Project in Sausalito, California
IHA
7/15/2024 - 7/14/2025
U.S. Army Corps of Engineers
Small Boat Harbor Preconstruction Activities (Geotechnical Surveys) in St. George, Alaska
IHA
4/15/2025 - 6/15/2025
Transcontinental Gas Pipe Line Company LLC
Construction with the LNYBL Natural Gas Pipeline Maintenance in Sandy Hook Channel, New Jersey
IHA
6/15/2024 - 6/14/2025
Chevron Products Company
Renewal of Long Wharf Maintenance and Efficiency Project in San Francisco Bay, California
IHA
6/1/2024 - 5/31/2025
Port of Alaska
North Extension Stabilization – Step 1 Project in Anchorage, Alaska
IHA
4/1/2024 - 3/31/2025
Pacific Air Forces Regional Support Center
Construction activities at Eareckson Air Station Fuel Pier Repair in Alcan Harbor, Shemya Island, Alaska
IHA
4/1/2024 - 3/31/2025
Turnagain Marine Construction
Renewal of Cruise Dock Construction Project in Whittier, Alaska
IHA
4/1/2024 - 3/31/2025
California Department of Transportation
Renewal of Richmond-San Rafael Bridge Restoration Project in Richmond, CA
IHA
4/1/2024 - 3/30/2025
U.S. Navy
Construction of Ammunition Pier and Turning Basin at Naval Weapons Station Seal Beach, California
LOA
3/25/2020 - 3/24/2025
U.S. Navy
Mole Pier South Berth Floating Dry Dock Project
IHA
3/1/2024 - 2/28/2025
U.S. Navy
Submarine Base New London Pier Construction, Groton, CT
LOA
3/1/2020 - 2/28/2025
U.S. Army Corps of Engineers
North Jetty Maintenance and Repairs Project, Coos Bay, Oregon
IHA
9/1/2022 - 2/28/2025
City of Oceanside
Harbor Fishing Pier and Non-Motorized Vessel Launch Improvement Project in Oceanside, CA
IHA
3/1/2024 - 2/28/2025
Chesapeake Tunnel Joint Venture
Parallel Thimble Shoal Tunnel Project in Virginia Beach, Virginia
IHA
2/15/2024 - 2/14/2025
NOAA Office of Marine and Aviation Operations
Research Vessel Relocation at Naval Station Newport in Rhode Island
IHA
2/1/2024 - 1/31/2025
United States Navy
Construction at U.S. Naval Submarine Base New London in Groton, Connecticut
IHA
12/1/2024 - 11/30/2025
Trident Seafoods' Corporation
Bunkhouse Dock Replacement Project in Alaska
IHA
3/1/2024 - 2/28/2025
U.S. Army Corps of Engineers
Unalaska (Dutch Harbor) Channel Deepening Project in Unalaska, Alaska
IHA
1/1/2024 - 12/31/2024
Port of Bellingham
Bellingham Shipping Terminal in Bellingham, Washington
IHA
11/6/2023 - 11/5/2024
United States Coast Guard
Construction in Astoria, Oregon
IHA
11/6/2023 - 11/5/2024
Municipality of Skagway
Modification of the Skagway Ore Terminal Redevelopment Project in Skagway, Alaska
IHA
4/29/2024 - 9/30/2024
U.S. Navy
Naval Base Point Loma Pier 302 Replacement Project
IHA
10/1/2023 - 9/30/2024
City of Ketchikan
Reissuance of Berth III New Mooring Dolphins Project in Ketchikan, Alaska
IHA
10/1/2023 - 9/30/2024
California Department of Fish and Wildlife
Renewal of Tidal Marsh Restoration Project in Elkhorn Slough, Phase III (2021), Monterey, CA
IHA
9/16/2023 - 9/15/2024
Washington Department of Transportation
Renewal of Bainbridge Island Ferry Terminal Overhead Loading Replacement Project and Eagle Harbor Maintenance Facility Slip F Improvement Project
IHA
9/16/2023 - 9/15/2024
Alaska Department of Transportation and Public Facilities
Tongass Narrows Project (2023)
IHA
9/11/2023 - 9/10/2024
San Francisco Bay Area Water Emergency Transportation Authority
Alameda Main Street Ferry Terminal Project in Alameda, California
IHA
8/15/2023 - 8/14/2024
City of Seattle
Renewal of Pier 58 Reconstruction Project, Seattle, WA
IHA
8/10/2023 - 7/31/2024
U.S. Army Corps of Engineers
Reissuance of Debris Dock Replacement Project in Sausalito, California
IHA
7/15/2023 - 7/14/2024
Maine Department of Transportation
Falls Bridge Project in Blue Hill, Maine
IHA
7/1/2023 - 6/30/2024
Chevron Products Company
Point Orient Wharf Removal in San Francisco Bay, California
IHA
6/1/2022 - 5/31/2024
Chevron Products Company
Long Wharf Maintenance and Efficiency Program in San Francisco Bay, CA (2023)
IHA
6/1/2023 - 5/31/2024
U.S. Navy
Marine Structure Maintenance and Pile Replacement, Washington
LOA
5/17/2019 - 5/17/2024
U.S. Army Corps of Engineers
Renewal of Port San Luis Breakwater Repair Project in Avila Beach, California
IHA
5/5/2023 - 3/31/2024
California Department of Transportation
Richmond-San Rafael Bridge Restoration Project in Richmond, CA
IHA
8/1/2023 - 3/30/2024
U.S. Navy
Renewal of Construction at Portsmouth Naval Shipyard, Kittery, Maine (2023)
IHA
4/1/2023 - 3/31/2024
Turnagain Marine Construction
Cruise Dock Construction Project in Whittier, Alaska
IHA
4/1/2023 - 3/31/2024
U.S. Navy
Renewal of Replacement of Pier 3 at Naval Station Norfolk in Norfolk, Virginia (2023)
IHA
3/30/2023 - 3/29/2024
Alaska Department of Transportation and Public Facilities
Ferry Berth Improvements in Tongass Narrows, Alaska (2022)
IHA
3/5/2023 - 3/4/2024
U.S. Navy
Renewal of Fuel Pier Removal at Naval Base San Diego, California
IHA
1/15/2023 - 1/14/2024
Bureau of Land Management
Stabilization of the Punta Gorda Lighthouse Project in Humboldt County, California (Phase 2)
IHA
6/1/2023 - 10/1/2023
Chesapeake Tunnel Joint Venture
Renewal of Chesapeake Tunnel Joint Venture Parallel Thimble Shoal Tunnel Project in Virginia Beach, Virginia (2021)
IHA
11/16/2022 - 11/15/2023
U.S. Navy
Renewal of Naval Base San Diego Pier 6 Replacement Project, San Diego, California
IHA
10/17/2022 - 9/30/2023
U.S. Navy
Renewal of U.S. Navy Floating Dry Dock Project at Naval Base San Diego, California
IHA
10/19/2022 - 9/14/2023
Washington Department of Transportation
Bainbridge Island Ferry Terminal Overhead Loading Replacement Project and Eagle Harbor Maintenance Facility Slip F Improvement Project
IHA
9/16/2022 - 9/15/2023
California Department of Fish and Wildlife
Reissue of Tidal Marsh Restoration Project in Elkhorn Slough, Phase III (2022), Monterey, CA
IHA
9/16/2022 - 9/15/2023
U.S. Army Corps of Engineers
North Jetty Maintenance and Repairs Project, Coos Bay, Oregon
IHA
9/1/2020 - 6/30/2023
Carnival Corporation & GHD
Renewal of Cruise Terminal Improvement Project in the Port of Long Beach, CA
IHA
01/18/2023 - 12/9/2023
City of Hoonah
Marine Industrial Center Cargo Dock Project, Hoonah, Alaska
IHA
10/1/2022 - 9/30/2023
City of Seattle
Pier 58 Reconstruction Project, Seattle, WA
IHA
8/1/2022 - 7/31/2023
City of Seattle
City of Seattle Pier 63 Removal Project, Seattle, WA
IHA
8/1/2022 - 7/31/2023
U.S. Army Corps of Engineers
North Jetty Maintenance and Repairs Project, Coos Bay, Oregon
IHA
9/1/2021 - 6/30/2023
Maine Department of Transportation
Falls Bridge Project in Blue Hill, Maine
IHA
7/1/2022 - 6/30/2023
United States Coast Guard
Floating Dock Extension Project at Base Ketchikan, Alaska
IHA
7/1/2022 - 6/30/2023
Alaska Department of Transportation and Public Facilities
Metlakatla Seaplane Facility Refurbishment Project, Metlakatla, Alaska
IHA
7/1/2022 - 6/30/2023
U.S. Navy
Construction at Portsmouth Naval Shipyard, Kittery, Maine (2022)
IHA
4/1/2022 - 3/31/2023
U.S. Navy
Replacement of Pier 3 at Naval Station Norfolk in Norfolk, Virginia
IHA
04/01/2022 - 03/31/2023
U.S. Army Corps of Engineers
Port San Luis Breakwater Repair Project in Avila Beach, California
IHA
4/1/2022 - 3/21/2023
Alaska Department of Transportation
Ferry Berth Improvements in Tongass Narrows, Alaska (2022)
IHA
3/5/2022 - 3/4/2023
Alaska Department of Transportation
Reissuance of Ferry Berth Improvements in Tongass Narrows, Alaska (2022)
IHA
3/1/2022 - 2/28/2023
NOAA's Office of Marine and Aviation Operations
Port Facility Project in Ketchikan, Alaska
IHA
2/3/2022 - 2/2/2023
U. S. Coast Guard
Reissuance of Los Angeles Wharf Expansion Project, California
IHA
2/1/2022 - 1/31/2023
U.S. Navy
Fuel Pier Removal at Naval Base San Diego, California
IHA
01/15/2022 - 01/14/2023
U.S. Navy
Transit Protection Program Pier and Support Facilities Project at Naval Base Kitsap Bangor, Washington
IHA
7/16/2021 - 1/15/2023
U.S. Army Corps of Engineers
Debris Dock Replacement Project in Sausalito, California
IHA
1/5/2022 - 1/4/2023
Carnival Corporation & PLC
Reissuance of Cruise Terminal Improvement Project in the Port of Long Beach, CA (2021)
IHA
12/10/2021 - 12/9/2022
Chesapeake Tunnel Joint Venture (CTJV)
Parallel Thimble Shoal Tunnel Project in Virginia Beach, Virginia (2021)
IHA
11/16/2021 - 11/15/2022
National Science Foundation
Palmer Station Pier Replacement Project in Anvers Island, Antarctica
IHA
10/27/2021 - 10/26/2022
U.S. Navy
Naval Base San Diego Pier 6 Replacement Project, San Diego, California
IHA
10/1/2021 - 9/30/2022
Bureau of Land Management
Stabilization Project for the Punta Gorda Lighthouse in Humboldt County, CA
IHA
6/1/2022 - 10/1/2022
U.S. Navy
Floating Dry Dock Project at Naval Base San Diego, California
IHA
9/15/2021 - 9/14/2022
Port of Alaska
South Floating Dock in Anchorage, AK
IHA
8/27/2021 - 8/26/2022
U.S. Navy
Renewal of Service Pier Extension Project on Naval Base Kitsap Bangor, Washington
IHA
8/11/2021 - 7/15/2022
Pacific Shops, Inc.
Alameda Marina Shoreline Improvement Project
IHA
8/1/2020 - 7/31/2022
Washington State Department of Transportation
Seattle Multimodal Project, Seattle, Washington (Season 4 - 2020)
IHA
8/1/2021 - 7/31/2022
U.S. Navy
Submarine Base Kings Bay Waterfront Construction, Kings Bay, Georgia
LOA
7/12/2017 - 7/11/2022
U.S. Navy
Dry Dock Expansion Project at Portsmouth Naval Shipyard, Kittery, Maine (2021)
IHA
6/2/2021 - 6/1/2022
Chevron Products Company
Richmond Refinery Long Wharf Maintenance and Efficiency Project in San Francisco Bay, California (2021)
IHA
6/1/2021 - 5/31/2022
California Department of Fish and Wildlife
Renewal of Tidal Marsh Restoration Project in Elkhorn Slough, Phase II (2020), Monterey, CA
IHA
6/30/2021 - 5/31/2022
Transcontinental Gas Pipe Line Company
Construction Activities Associated with the Raritan Bay Pipeline off New York and New Jersey
IHA
5/1/2021 - 4/30/2022
U.S. Army Corps of Engineers
Jetty System Rehabilitation at Mouth of Columbia River, Oregon/Washington
IHA
5/1/2017 - 4/30/2022
Sonoma County Water Agency
Estuary Management Activities in Sonoma County, California
LOA
4/21/2017 - 4/20/2022
Halibut Point Marine Services, LLC
Old Sitka Dock North Dolphins Expansion Project in Sitka, Alaska (2021)
IHA
4/22/2021 - 4/14/2022
Port of Alaska
Construction of the Petroleum and Cement Terminal (PCT)
IHA
4/1/2020 - 3/31/2022
Chesapeake Tunnel Joint Venture
Renewal of Parallel Thimble Shoal Tunnel Project in Virginia Beach, Virginia
IHA
3/9/2021 - 3/8/2022
Alaska Department of Transportation
Renewal of Ferry Berth Improvements in Tongass Narrows, Alaska (Year 1)
IHA
4/26/2021 - 2/28/2022
Alaska Department of Transportation
Ferry Berth Improvements in Tongass Narrows, Alaska
IHA
3/1/2020 - 2/28/2022
U.S. Navy
Renewal of Dry Dock Expansion Project at Portsmouth Naval Shipyard, Kittery, Maine
IHA
3/12/2021 - 2/27/2022
Washington State Department of Transportation (WADOT)
Purdy Bridge Rehabilitation Project, Pierce County, WA
IHA
7/16/2021 - 2/15/2022
U.S. Navy
Reissuance of South Quay Wall Recapitalization Project, Naval Station Mayport, Florida
IHA
1/1/2021-12/31/2021
Jim Erickson
Reissuance of Erickson Residence Marine Access Project, Auke Bay, Alaska
IHA
1/1/2021 - 12/31/2021
Washington Department of Transportation
State Route 520 Pontoon Pile Removal Project, Aberdeen, Grays Harbor County, Washington
IHA
12/21/2020 - 12/20/2021
Carnival Corporation & PLC
Reissuance of Cruise Terminal Improvement Project in the Port of Long Beach, CA
IHA
12/10/2020 - 12/9/2021
Alaska Department of Transportation
Reissuance of Auke Bay Ferry Terminal Modifications and Improvements
IHA
11/1/2020 - 10/31/2021
Port of Kalama
Port Expansion Project
IHA
11/23/2020 - 10/18/2021
U.S. Army Corps of Engineers
King Pile Markers, Columbia River
IHA
10/1/2020 - 9/30 2021
City of Juneau, AK
Statter Harbor Improvement Project
IHA
10/1/2020 - 9/30 2021
GCHS
Sentinel Island Moorage Float
IHA
7/15/2021 - 9/20/2021
U.S. Army Corps of Engineers, Portland District
Sand Island Pile Dike System Test Piles Project near the Mouth of the Columbia River
IHA
9/15/2020 - 9/14/2021
Washington Department of Transportation
Seattle Multimodal Project, Seattle, Washington (Season 4- 2020)
IHA
9/10/2020 - 9/9/2021
Washington Department of Transportation
Mukilteo Multimodal Project, Puget Sound, Washington (Season 4- 2020)
IHA
8/1/2020 - 7/31/2021
U.S. Navy
Service Pier Extension Project, Naval Base Kitsap Bangor, Washington
IHA
7/16/20 - 7/15/21
City and County of San Francisco, CA
Treasure Island Ferry Dock Project, San Francisco, California
IHA
7/15/2020 - 7/14/2021
Hampton Roads Connector Partners
Hampton Roads Bridge-Tunnel Expansion Project, Hampton-Norfolk, Virginia
IHA
7/10/2020 - 7/9/2021
Crowley Fuels, LLC
Kotzebue Dock Upgrade in Kotzebue, Alaska
IHA
7/6/2020 - 7/5/2021
U.S. Navy
Reissuance of South Quay Wall Recapitalization Project
IHA
7/1/2020 - 6/30/2021
Alaska Marine Lines, Inc. (AML)
Lutak Dock Project in Haines, Alaska
IHA
6/15/2020 - 6/14/2021
California Department of Fish and Wildlife (CDFW)
Tidal Marsh Restoration Project in Elkhorn Slough, Phase II (2020), Monterey, CA
IHA
6/1/2020- 5/31/2021
Chevron Products Company
Renewal of Long Wharf Maintenance and Efficiency Project in San Francisco Bay, California (2020)
IHA
6/15/2020- 5/31/2021
Alaska Department of Transportation and Public Facilities (ADOT)
Reissuance of City Dock and Ferry Terminal Construction in Tenakee Springs, Alaska
IHA
6/1/2020- 5/31/2021
Power Systems & Supplies of Alaska (PSSA)
Ward Cove Cruise Ship Dock Project
IHA
5/11/2020 - 5/10/2021
Chesapeake Tunnel Joint Venture (CTJV)
Parallel Thimble Shoal Tunnel Project in Virginia Beach, Virginia (2020)
IHA
03/10/2020 - 03/9/2021
Halibut Point Marine Services, LLC
Old Sitka Dock North Dolphins Expansion Project in Sitka, Alaska
IHA
10/1/2020- 2/28/2021
U.S. Navy
Dry Dock Expansion Project at Portsmouth Naval Shipyard, Kittery, Maine
IHA
3/1/2020- 2/28/2021
Alaska DOT
Gustavus Ferry Terminal Improvement Project
IHA
2/15/2020 - 2/14/2021
Alaska DOT
Whittier Ferry Terminal Alaska Class Ferry Modification Project
IHA
2/1/2020- 1/31/2021
Jim Erickson
Erickson Residence Marine Access Project
IHA
1/1/2020 - 12/31/2020
Alaska DOT
Auke Bay Ferry Terminal Modifications and Improvements
IHA
1/1/2020- 12/31/2020
City of Astoria
Waterfront Bridge Replacement Project (Phase 2, 2019)
IHA
12/9/2019-12/8/2020
Carnival Corporation & PLC
Terminal Improvement Project in the Port of Long Beach, California
IHA
11/19/2019- 11/18/2020
Port of Kalama
Port Expansion Project, Kalama, Washington
IHA
10/19/2019- 10/18/2020
City of Juneau
Harbor Improvement Project, Juneau, Alaska
IHA
10/1/2019 - 9/30/2020
Gastineau Channel Historical Society
Sentinel Island Moorage Float Project, Juneau, Alaska
IHA
7/15/2020 - 9/20/2020
City of Ketchikan
Underwater Confined Blasting, Ketchikan, Alaska
IHA
9/16/2019 - 9/15/2020
City of Alameda
Ferry Terminal Construction, Seaplane Lagoon, Alameda, CA
IHA
8/20/2019 - 8/19/2020
Washington Department of Transportation
Renewal of Dolphin Relocation at Bremerton Ferry Terminal
IHA
8/8/2019 - 8/7/2020
Washington Department of Transportation
Reissuance of Mukilteo Multimodal Project, Puget Sound, Washington (Season 3 2018)
IHA
8/1/2019 - 7/31/2020
Washington Department of Transportation
Seattle Multimodal Construction Project, Seattle, Washington (2019)
IHA
8/1/2019 - 7/31/2020
City and Borough of Juneau (CBJ)
Modification to Juneau Waterfront Improvement Project in Juneau, Alaska
IHA
3/19/2020-7/14/2020
City and Borough of Juneau (CBJ)
Juneau Waterfront Improvement Project in Juneau, Alaska
IHA
7/15/2019 - 7/14/2020
Duck Point Development II, LLC
Pile Driving and Removal Activities During Construction of a Cruise Ship Berth, Hoonah, Alaska
IHA
6/3/2019 - 6/2/2020
Chevron
Long Wharf Maintenance and Efficiency Project in San Francisco Bay, California (2019)
IHA
6/1/2019 - 5/31/2020
City and Borough of Sitka
O’Connell Bridge Lightering Float Pile Replacement Project, Sitka, Alaska
IHA
6/1/2019 - 5/31/2020
San Francisco Bay Area Water Emergency Transportation Authority
Renewal of San Francisco Bay Area Water Emergency Transportation Authority Ferry Terminal Expansion Project 2019
IHA
6/1/2019 - 5/31/2020
Santa Cruz Port District
Aldo's Seawall Replacement Project in Santa Cruz, California
IHA
6/1/2019 - 5/31/2020
Port of San Francisco
Mission Bay Ferry and Water Taxi Landing Project in San Francisco Bay, California
IHA
6/01/2019 - 5/31/2020
Alaska DOT
City Dock and Ferry Terminal Construction, Tenakee Springs, Alaska
IHA
6/1/2019 - 5/31/2020
Alaska DOT
Sand Point City Dock Replacement Project
IHA
5/31/2019-5/30/2020
Federal Aviation Administration (FAA)
Biorka Island Dock Replacement Project
IHA
5/1/2019 - 4/30/2020
U.S. Army Corps of Engineers, Jacksonville District (USACE)
Tampa Harbor Big Bend Channel Expansion Project
IHA
4/1/2019 - 3/31/2020
Washington Department of Transportation
US 101/Chehalis River Bridge-Scour Repair
IHA
07/15/2019 - 2/15/2020
White Pass & Yukon Route (WP&YR)
Railroad Dock Dolphin Installation Project
IHA
2/15/2019 - 2/14/2020
Alaska DOT
Gustavus Ferry Terminal Improvement Project, Gustavus Alaska
IHA
12/15/2018 - 12/14/2019
Port of Kalama
Port Expansion Project, Kalama, Washington (2018-2019)
IHA
10/18/2018 - 10/18/2019
Washington Department of Transportation
Mukilteo Multimodal Project, Puget Sound, Washington (Season 3 2018)
IHA
10/1/2018 - 9/30/2019
Washington Department of Transportation
Ferry Terminal Dolphin Relocation at Bremerton and Edmonds Ferry Terminals
IHA
10/1/2018 - 9/30/2019
Kitsap Transit
Annapolis Passenger Ferry Dock Project, Puget Sound, Washington
IHA
10/1/2018 - 9/31/2019
Astoria, Oregon
Waterfront Bridge Replacement, Astoria, Oregon
IHA
10/1/2018 - 9/31/2019
Alaska Department of Transportation
Haines Ferry Terminal Modification Project, Haines, Alaska
IHA
10/1/2018 - 9/30/2019
Ketchikan Dock Company
Berth IV Expansion Project, Ketchikan, Alaska
IHA
10/1/2018 - 8/31/2019
Chesapeake Tunnel Joint Venture
Parallel Thimble Shoal Tunnel Project in Virginia Beach, Virginia
IHA
8/1/2018 - 7/31/2019
Washington State Department of Transportation
Seattle Multimodal Construction Project, Seattle, Washington (2018)
IHA
8/1/2018 - 7/31/2019
Washington Dept of Transportation
U.S. 101/Chehalis River Bridge-Scour Repair in Washington State
IHA
7/01/2018 - 6/30/2019
S.F. Bay Area Water Emergency Transportation Authority
Ferry Terminal Expansion Project 2018
IHA
6/1/2018 - 5/31/2019
Chevron
Long Wharf Maintenance and Efficiency Project in San Francisco Bay, California 2018
IHA
6/1/2018 - 5/31/2019
San Diego
Coast Boulevard Improvements in La Jolla, California
IHA
6/1/2018 - 5/31/2019
California Department of Transportation
Dismantling and Reuse of the San Francisco-Oakland Bay Bridge East Span (2018)
IHA
5/24/2018 - 5/23/2019
U.S. Navy
Naval Station Mayport Bravo Wharf Maintenance, Jacksonville, Florida
IHA
5/14/18- 5/13/2019
Federal Aviation Administration
Biorka Island Dock Replacement Project, Sitka, AK
IHA
5/01/2018 - 4/30/2019
U.S. Navy
Bravo Wharf Recapitalization Project (Year 2), Jacksonville, FL
IHA
3/13/2018 - 3/12/2019
Seattle Department of Transportation
Pier 62 Restoration, Seattle Waterfront, Elliott Bay
IHA
8/1/2018 - 2/29/2019
U.S. Navy
Waterfront Improvement Projects at Portsmouth Naval Shipyard (Year 2), Kittery, ME
IHA
1/8/2018 - 1/7/2019
Chevron
Richmond Refinery Long Wharf Maintenance and Efficiency Project, SF Bay, CA
IHA
1/01/2018 - 12/31/2018
Venoco LLC
Fender Pile Replacement at Casitas Pier, Carpenteria, CA
IHA
11/1/2017 -10/31/2018
City of Seattle, WA
Elliott Bay Seawall Project
LOA
10/21/2013 -
10/21/2018
U.S. Coast Guard
Waterfront Repairs at USCG Station Monterey, Monterey, CA
IHA
12/20/2017 - 10/15/2018
U.S. Navy
Fuel Pier Replacement Project at Naval Base Point Loma, San Diego, CA (Year 5)
IHA
10/8/2017 - 10/7/2018
Port of Kalama, WA
Port of Kalama Expansion Project, Kalama, WA
IHA
9/1/2017 -8/31/2018
California Department of Transportation
San Francisco-Oakland Bay Bridge East Span Dismantling Project
IHA
9/1/2017 -8/31/2018
S.F. Bay Area Water Emergency Transportation Authority
Central Bay Operations and Maintenance Facility Project, Alameda, CA
IHA
8/01/2017 - 7/31/2018
California Dept. of Fish & Wildlife
Tidal Marsh Restoration Project in Elkhorn Slough, Monterey, CA
IHA
8/01/2017 - 7/31/2018
Washington Dept of Transportation
Mukilteo Multimodal Construction Project
IHA
8/01/2017 - 7/31/2018
Washington Dept of Transportation
Seattle Multimodal Construction Project, Seattle, WA
IHA
8/01/2017 - 7/31/2018
S.F. Bay Area Water Emergency Transportation Authority
Ferry Terminal Expansion Project, CA
IHA
6/1/2017 - 5/31/2018
City of Unalaska, AK
Dock Expansion Project
IHA
4/28/2017 - 4/27/2018
Seattle DOT
Pier 62 Restoration Project, Seattle, WA
IHA
10/4/2017 - 2/28/2018
Maine DOT
Eastport Breakwater Project, Eastport, ME
IHA
1/26/2017 -1/25/2018
City and Borough of Sitka, Alaska
Gary Paxton Industrial Park Dock Modification Project
IHA
10/1/2017 - 12/31/2017
California Department of Transportation
Dismantling of East Span of San Francisco-Oakland Bay Bridge, CA
IHA
9/19/2016 - 9/18/2017
U.S. Navy
Point Loma Fuel Pier Replacement Project
IHA
10/08/2016 -10/07/2017
Sonoma County Water Agency
Estuary Management Project
IHA
04/21/2016 -04/20/2017
Washington Dept of Transportation
Coupeville Timber Towers Preservation Project
IHA
7/15/2016 -7/14/2017
Municipality of Anchorage
Port of Anchorage Test Pile Program
IHA
4/01/2016 -3/31/2017
U.S. Army Corps of Engineers
Jetty Rehabilitation
IHA
5/01/2016 - 4/30/2017
UniSea Inc.
Dock Construction Project
IHA
3/01/2016 - 2/28/2017
San Francisco Bay Area Water Emergency Transportation Authority
Ferry Terminal Expansion Project
IHA
6/28/2016 - 12/31/2016
Bergerson Construction, Inc.
Front Street Transload Facility Construction
IHA
11/01/2015 - 10/31/2016
San Francisco Bay Area Water Emergency Transportation Authority
Central Bay Operations and Maintenance Facility Project
IHA
12/01/2015 - 11/30/2016
U.S. Navy
Point Loma Fuel Pier Replacement Project
IHA
10/08/15 -10/07/16
U.S. Navy
Kitsap Pier 4 Maintenance
IHA
12/01/2015 -11/30/2016
Alaska Dept. of Transportation and Public Facilities
Ferry Terminal and Dock Improvements
IHA
09/30/2015 - 09/29/2016
Washington State Department of Transportation
Anacortes Tie-Up Slips Replacement
IHA
09/01/2015 - 08/31/2016
Sonoma County Water Agency
Estuary Management project near Santa Rosa, CA
IHA
04/21/2015 - 04/20/2016
Maine Department of Transportation
Pier and Breakwater Replacement Project
IHA
07/20/2015 -
07/19/2016
California Department of Transportation
Construction of the East Span of the San Francisco-Oakland Bay Bridge
IHA
07/17/2015 - 07/16/2016
U.S. Navy
Wharf Recapitalization Project
IHA
09/08/2015 - 09/07/2016
Washington State Department of Transportation
Mukilteo Ferry Terminal Replacement Project
IHA
09/01/2015 - 08/31/2016
Washington State Department of Transportation
Vashon Ferry Terminal Trestle Seismic Retrofit Project
IHA
8/01/2015 - 7/31/2016
City of San Diego
Construction Activities at the Children's Pool Lifeguard Station in La Jolla, CA.
IHA
06/28/2015 - 06/27/2016
U.S. Navy
Kitsap Pier 6 Maintenance
IHA
09/01/2015 - 03/01/2016
U.S. Navy
Kitsap Bangor Wharf Maintenance Project
IHA
07/16/2015 - 01/15/2016
Huna Totem Corporation
Re-development of the Icy Strait Point Cruise Ship Terminal
IHA
06/01/2015 - 12/31/2015
California Department of Transportation
San Francisco-Oakland Bay Bridge Pier E3 Demolition
IHA
10/01/2015 - 12/30/2015
U.S. Navy
Point Loma Fuel Pier Replacement Project
IHA
10/08/2014 -
10/07/2015
U.S. Coast Guard
Monterey Waterfront Improvement Project
IHA
10/01/2014 - 09/30/2015
Washington State Department of Transportation
Bremerton Ferry Terminal Wingwall Replacement Project
IHA
09/01/2014 -
08/31/2015
Washington State Department of Transportation
Mukilteo Ferry Terminal Construction Work
IHA
09/01/2014 -
08/31/2015
U.S. Navy
Wharf Recapitalization Project
IHA
09/01/2014 -
08/31/2015
City of San Diego
Demolition and Construction activities at the Children's Pool Lifeguard Station
IHA
06/28/2014 - 06/27/2015
Port of Friday Harbor, WA
Marina Reconstruction Project
IHA
09/03/2014 -
02/15/2015
U.S. Navy
Kitsap Bangor Wharf Construction Project
IHA
07/16/2014 -
02/15/2015
Sonoma County Water Agency
Russian River Estuary Management project
IHA
04/21/2014 -
04/20/2015
U.S. Navy
Kitsap Pier 6 Pile Replacement
IHA
10/01/2014 -
03/01/2015
St. George Reef Lighthouse Preservation Society
Lighthouse Restoration Project
IHA
04/11/2014 - 04/10/2015
California Department of Transportation
Replacement Bridge Construction
IHA
01/08/2014 -
01/07/2015
More Information
Incidental Take Authorization under the MMPA
Apply for an Incidental Take Authorization
Explore Incidental Take Authorizations for military readiness activities
Explore Incidental Take Authorizations for oil and gas activities
Explore Incidental Take Authorizations for other energy activities
Explore Incidental Take Authorizations for research and other activities
Office of Protected Resources
on 04/21/2026
Marine Mammal Protection Act
Incidental Take Authorizations
Marine Mammals
US