Shuttle
288 captures
09 Mar 2002 - 04 Feb 2026
Mar
APR
May
07
2003
2004
2005
success
fail
About this capture
COLLECTED BY
Organization:
Alexa Crawls
Starting in 1996,
Alexa Internet
has been donating their crawl data to the Internet Archive. Flowing in every day, these data are added to the
Wayback Machine
after an embargo period.
Collection:
alexa_dw
this data is currently not publicly accessible.
TIMESTAMPS
The Wayback Machine - https://web.archive.org/web/20040407180138/http://www.astronautix.com:80/lvs/shuttle.htm
Encyclopedia
Astronautica
astronautix.com
topic index
space wire
Shuttle side view
Credit: © Mark Wade
258 x 612 pixels - 7,022 bytes
Shuttle 2 views
Credit: © Mark Wade
525 x 615 pixels - 13,544 bytes
Shuttle Night Launch
Credit: NASA
477 x 453 pixels - 15,622 bytes
Shuttle Landing
Credit: NASA
474 x 298 pixels - 24,373 bytes
Now it is time to take longer strides-time for this nation to take a clearly leading role in space achievement, which in many ways may hold the key to our future on Earth. We go into space because whatever mankind must undertake, free men must fully share . . .
---
Kennedy
Shuttle
STS
Credit: NASA
Winged orbital launch vehicle.
Year
: 1981. Family:
Shuttle
Country
: USA.
Status
: Hardware.
Other Designations
: STS.
Manufacturer's Designation
: Space Transportation System.
Manufacturer
: NASA.
The manned reusable space system which was designed to slash the cost of space transport and replace all expendable launch vehicles. It did neither, but did keep NASA in the manned space flight business for 30 years (and counting...) Redesign of the shuttle with reliability in mind after the Challenger disaster reduced maximum payload to low earth orbit from 27,850 kg to 24,400 kg.
Launches
: 113.
Failures
: 1.
Success Rate
: 99.12% pct.
First Launch Date
: 12 April 1981.
Last Launch Date
: 16 January 2003.
Launch data is
: continuing.
LEO Payload
: 24,400 kg.
to
: 204 km Orbit.
at
: 28.5 degrees.
Payload
: 12,500 kg.
to a
: space station orbit, 407 km, 51.6 deg inclination trajectory.
Apogee
: 600 km.
Liftoff Thrust
: 2,625,932 kgf.
Liftoff Thrust
: 25,751.60 kN.
Total Mass
: 2,029,633 kg.
Core Diameter
: 8.70 m.
Total Length
: 56.00 m.
Development Cost $
: 10,100.00 million.
in
1977 average dollars.
Launch Price $
: 245.00 million.
in
1988 price dollars.
Total Production Built
: 5.
Flyaway Unit Cost $
: 63.00 million.
in
1988 unit dollars.
Cost comments
: Shuttle has high fixed costs and low marginal costs. Cost per mission dependent on rate. Flyaway cost is marginal cost for extra mission. Launch cost is cost per flight at 6 per year.
Stage Data - Shuttle
Stage Number
: 0. 2 x
Shuttle SRB
Gross Mass
: 589,670 kg.
Empty Mass
: 86,183 kg.
Thrust (vac)
: 1,174,713 kgf.
Isp
: 269 sec.
Burn time
: 124 sec.
Isp(sl)
: 237 sec.
Diameter
: 3.71 m.
Span
: 5.10 m.
Length
: 38.47 m. Propellants:
Solid
No Engines
: 1.
SRB
Other designations
: Solid Rocket Booster.
Status
: Hardware.
Stage Number
: 1. 1 x
Shuttle Tank
Gross Mass
: 750,975 kg.
Empty Mass
: 29,930 kg.
Thrust (vac)
: 0.000 kgf.
Isp
: 455 sec.
Burn time
: 480 sec.
Isp(sl)
: 363 sec.
Diameter
: 8.70 m.
Span
: 8.70 m.
Length
: 46.88 m. Propellants:
Lox/LH2
No Engines
: 0.
None
Other designations
: External Tank.
Status
: Hardware.
Stage Number
: 2. 1 x
Shuttle Orbiter
Gross Mass
: 99,318 kg.
Empty Mass
: 99,117 kg.
Thrust (vac)
: 696,905 kgf.
Isp
: 455 sec.
Burn time
: 480 sec.
Isp(sl)
: 363 sec.
Diameter
: 4.90 m.
Span
: 23.79 m.
Length
: 37.24 m. Propellants:
Lox/LH2
No Engines
: 3.
SSME
Other designations
: Shuttle; STS (Space Transportation System).
Status
: Hardware.
Shuttle Chronology
1969 Apr 21 -
Space Shuttle Task Group formed The Director of Apollo Test in the NASA Hq. Apollo Program Office, LeRoy E. Day, was detailed to head the MSF Space Shuttle Task Group. The group would provide NASA with material for a report on the Space Shuttle to the President's Space Task Group.
1969 Sep 11 -
Two major directions were identified for NASA manned space flight in the next decade.
Two major directions were identified for manned space flight in the next decade. These were further exploration of the Moon, with possibly the establishment of a lunar surface base, and the continued development of manned flight in Earth orbit, leading to a permanent manned space station supported by a low-cost shuttle system. To maintain direction, the following key milestones were proposed: 1972 - AAP operations using a Saturn V launched Workshop 1973 - Start of post-Apollo lunar exploration 1974 - Start of suborbital flight tests of Earth to orbit shuttle - Launch of a second Saturn V Workshop 1975 - Initial space station operations - Orbital shuttle flights 1976 - Lunar orbit station - Full shuttle operations 1977 - Nuclear stage flight test 1978 - Nuclear shuttle operations-orbit to orbit 1979 - Space station in synchronous orbit By 1990 - Earth orbit space base - Lunar surface base - Possible Mars landing
1972 Aug 9 -
Shuttle go-ahead. Rockwell receives authority to proceed, space shuttle orbiter
1974 Jun 4 -
Shuttle Enterprise assembly starts. Start structural assembly crew module, Enterprise (OV-101)
1975 Oct 17 -
Shuttle SSME first test. Space shuttle main engine first main stage test at NSTL
1975 Dec 20 -
First SSME 60-second duration test, NSTL
1976 Mar 12 -
Enterprise final assembly complete. Complete final assembly and closeout system installation.
1977 Jan 14 -
Boeing 747 shuttle carrier aircraft delivered Boeing 747 shuttle carrier aircraft delivered to Edwards
1977 Feb 18 -
First inert captive flight
Edwards
. Conduct first inert captive flight, Edwards (2 hours, 5 minutes), Enterprise (OV-101)
1977 Feb 22 -
Second inert captive flight
Edwards
. Conduct second inert captive flight, Edwards (3 hours, 13 minutes), Enterprise (OV-101)
1977 Feb 25 -
Third inert captive flight
Edwards
. Conduct third inert captive flight, Edwards (2 hours, 28 minutes), Enterprise (OV-101)
1977 Feb 28 -
Fourth inert captive flight
Edwards
. Conduct fourth inert captive flight, Edwards (2 hours, 11 minutes), Enterprise (OV-101)
1977 Mar 2 -
Fifth inert captive flight
Edwards
. Conduct fifth inert captive flight, Edwards (1 hour, 39 minutes), Enterprise (OV-101)
1977 Jun 18 -
Enterprise flight 1
Edwards
. First manned captive active flight. Enterprise (OV-101)/shuttle carrier aircraft, Edwards (55 minutes, 46 seconds)
1977 Jun 28 -
Enterprise flight 2
Edwards
. Second manned captive active flight. Enterprise (OV-101)/shuttle carrier aircraft, Edwards (1 hour, 2 minutes)
1977 Jul 26 -
Enterprise flight 3
Edwards
. Third manned captive active flight. Enterprise (OV-101)/shuttle carrier aircraft, Edwards (59 minutes, 50 seconds)
1977 Aug 12 -
Enterprise flight 4
Edwards
. Conduct first free flight, ALT, tail cone on, Edwards (5 minutes, 21 seconds), Enterprise (OV-101), lake bed Runway 17
1977 Sep 13 -
Enterprise flight 5
Edwards
. Second free flight, ALT, tail cone on, Edwards (5 minutes, 28 seconds), Enterprise (OV-101), lake bed Runway 17
1977 Sep 23 -
Enterprise flight 6
Edwards
. Third free flight , ALT, tail cone on, Edwards (5 minutes, 34 seconds), Enterprise (OV-101), lake bed Runway 15
1977 Oct 12 -
Enterprise flight 7
Edwards
. Fourth free flight, ALT, first tail cone off, Edwards (2 minutes, 34 seconds), Enterprise (OV-101), lake bed Runway 17
1977 Oct 26 -
Enterprise flight 8
Edwards
. Fifth free flight, ALT, final tail cone off, Edwards (2 minutes, 1 second), Enterprise (OV-101), concrete Runway 04
1977 Nov 15 -
First ferry flight test, Edwards
Edwards
. First ferry flight test, Edwards (3 hours, 21 minutes), Enterprise (OV-101)
1977 Nov 16 -
Second ferry flight test, Edwards
Edwards
. Second ferry flight test, Edwards (4 hours, 17 minutes), Enterprise (OV-101)
1977 Nov 17 -
Third ferry flight test, Edwards
Edwards
. Third ferry flight test, Edwards (4 hours, 13 minutes), Enterprise (OV-101)
1977 Nov 18 -
Fourth ferry flight test, Edwards
Edwards
. Fourth ferry flight test, Edwards (3 hours, 37 minutes), Enterprise (OV-101)
1977 Dec 9 -
Complete approach and landing flight tests
Edwards
. Complete approach and landing flight tests, including ferry flights, Enterprise (OV-101)
1979 Mar 9 -
Shuttle carrier aircraft/Columbia test flight Shuttle carrier aircraft/Columbia (OV-102) test flight at NASA Edwards
1979 Aug 1 -
Start long-lead fabrication crew module, Discovery
1981 Apr 12 12:00 -
Space Shuttle STS-1
Cape Canaveral
LC
: LC39A.
1981 Nov 12 15:10 -
Space Shuttle STS-2
Cape Canaveral
LC
: LC39A.
1982 Mar 22 16:00 -
Space Shuttle STS-3
Cape Canaveral
LC
: LC39A.
1982 Jun 27 15:00 -
Space Shuttle STS-4
Cape Canaveral
LC
: LC39A.
1982 Nov 11 12:19 -
Space Shuttle STS-5
Cape Canaveral
LC
: LC39A.
1983 Apr 4 18:30 -
Space Shuttle STS-6
Cape Canaveral
LC
: LC39A.
1983 Jun 18 11:33 -
Space Shuttle STS-7
Cape Canaveral
LC
: LC39A.
1983 Aug 30 6:32 -
Space Shuttle STS-8
Cape Canaveral
LC
: LC39A.
1983 Nov 28 16:00 -
Space Shuttle STS-9
Cape Canaveral
LC
: LC39A.
1984 Feb 3 13:00 -
Space Shuttle 41-B
Cape Canaveral
LC
: LC39A.
1984 Apr 6 13:58 -
Space Shuttle 41-C
Cape Canaveral
LC
: LC39A.
1984 Jun 26 -
Shuttle Discovery Pad Abort
Cape Canaveral
LC
: LC39A. The countdown for the second launch attempt for Discovery's maiden flight ended at T-
4 seconds when the orbiter's computers detected a sluggish valve in main engine #3.
The main engine was replaced and Discovery was finally launched on August 30, 1984.
1984 Aug 30 12:41 -
Space Shuttle 41-D
Cape Canaveral
LC
: LC39A.
1984 Oct 5 11:03 -
Space Shuttle 41-G
Cape Canaveral
LC
: LC39A.
1984 Nov 8 12:15 -
Space Shuttle 51-A
Cape Canaveral
LC
: LC39A.
1985 Jan 24 19:50 -
Space Shuttle 51-C
Cape Canaveral
LC
: LC39A.
1985 Apr 12 13:59 -
Space Shuttle 51-D
Cape Canaveral
LC
: LC39A.
1985 Apr 29 16:02 -
Space Shuttle 51-B
Cape Canaveral
LC
: LC39A.
1985 Jun 17 11:33 -
Space Shuttle 51-G
Cape Canaveral
LC
: LC39A.
1985 Jul 12 -
Shuttle Challenger Pad Abort
Cape Canaveral
LC
: LC39A. The countdown for Challenger's launch was halted at T-3 seconds when on-board
computers detected a problem with a coolant valve on main engine #2. The valve was
replaced and Challenger was launched on July 29, 1985.
1985 Jul 29 21:00 -
Space Shuttle 51-F
Cape Canaveral
LC
: LC39A.
1985 Aug 27 10:58 -
Space Shuttle 51-I
Cape Canaveral
LC
: LC39A.
1985 Oct 3 15:15 -
Space Shuttle 51-J
Cape Canaveral
LC
: LC39A.
1985 Oct 30 17:00 -
Space Shuttle 61-A
Cape Canaveral
LC
: LC39A.
1985 Nov 1 -
STS-51-H STS-51-H Planned EOM-1/2 shuttle mission. Cancelled due to payload delays.
1985 Nov 27 0:29 -
Space Shuttle 61-B
Cape Canaveral
LC
: LC39A.
1986 Jan 12 11:55 -
Space Shuttle 61-C
Cape Canaveral
LC
: LC39A.
1986 Jan 28 16:38 -
Failure.
Space Shuttle 51-L
Cape Canaveral
LC
: LC39B.
Apogee
: 15 km.
1988 Sep 1 -
STS-51-K STS-51-K Planned Spacelab-D1 shuttle mission. Cancelled after Challenger disaster. No crew selected; renamed STS-61A
1988 Sep 29 15:37 -
Space Shuttle STS-26R
Cape Canaveral
LC
: LC39B.
1988 Dec 2 14:30 -
Space Shuttle STS-27R
Cape Canaveral
LC
: LC39B.
1989 Mar 13 14:57 -
Space Shuttle STS-29R
Cape Canaveral
LC
: LC39B.
1989 May 4 18:47 -
Space Shuttle STS-30R
Cape Canaveral
LC
: LC39B.
1989 Aug 8 12:37 -
Space Shuttle STS-28R
Cape Canaveral
LC
: LC39B.
1989 Oct 18 16:53 -
Space Shuttle STS-34R
Cape Canaveral
LC
: LC39B.
1989 Nov 23 0:23 -
Space Shuttle STS-33R
Cape Canaveral
LC
: LC39B.
1990 Jan 9 12:35 -
Space Shuttle STS-32R
Cape Canaveral
LC
: LC39A.
1990 Feb 28 7:50 -
Space Shuttle STS-36R
Cape Canaveral
LC
: LC39A.
1990 Apr 24 12:33 -
Space Shuttle STS-31R
Cape Canaveral
LC
: LC39B.
1990 Oct 6 11:47 -
Space Shuttle STS-41
Cape Canaveral
LC
: LC39B.
1990 Nov 15 23:48 -
Space Shuttle STS-38
Cape Canaveral
LC
: LC39A.
1990 Dec 2 6:49 -
Space Shuttle STS-35R
Cape Canaveral
LC
: LC39B.
1991 Apr 5 14:22 -
Space Shuttle STS-37R
Cape Canaveral
LC
: LC39B.
1991 Apr 28 11:33 -
Space Shuttle STS-39
Cape Canaveral
LC
: LC39A.
1991 Jun 5 13:24 -
Space Shuttle STS-40
Cape Canaveral
LC
: LC39B.
1991 Aug 2 15:02 -
Space Shuttle STS-43
Cape Canaveral
LC
: LC39A.
1991 Sep 12 23:11 -
Space Shuttle STS-48
Cape Canaveral
LC
: LC39A.
1991 Nov 24 23:44 -
Space Shuttle STS-44
Cape Canaveral
LC
: LC39A.
1992 Jan 22 14:52 -
Space Shuttle STS-42
Cape Canaveral
LC
: LC39A.
1992 Mar 24 13:13 -
Space Shuttle STS-45
Cape Canaveral
LC
: LC39A.
1992 May 7 23:40 -
Space Shuttle STS-49
Cape Canaveral
LC
: LC39B.
1992 Jun 25 16:12 -
Space Shuttle STS-50
Cape Canaveral
LC
: LC39A.
1992 Jul 31 13:56 -
Space Shuttle STS-46
Cape Canaveral
LC
: LC39B.
1992 Sep 12 14:23 -
Space Shuttle STS-47
Cape Canaveral
LC
: LC39B.
1992 Oct 22 17:09 -
Space Shuttle STS-52
Cape Canaveral
LC
: LC39B.
1992 Dec 2 13:24 -
Space Shuttle STS-53
Cape Canaveral
LC
: LC39A.
1993 Jan 13 13:59 -
Space Shuttle STS-54
Cape Canaveral
LC
: LC39B.
1993 Mar 22 -
Shuttle Columbia Pad Abort
Cape Canaveral
LC
: LC39A.
The countdown for Columbia's launch was halted by on-board computers at T-3
seconds following a problem with purge pressure readings in the oxidizer preburner on
main engine #2 Columbia's three main engines were replaced on the launch pad, and
the flight was rescheduled behind Discovery's launch on STS-56. Columbia finally
launched on April 26, 1993.
1993 Apr 8 5:29 -
Space Shuttle STS-56
Cape Canaveral
LC
: LC39B.
1993 Apr 26 14:50 -
Space Shuttle STS-55
Cape Canaveral
LC
: LC39A.
1993 Jun 21 13:07 -
Space Shuttle STS-57
Cape Canaveral
LC
: LC39B.
1993 Aug 12 -
Shuttle Discovery Pad Abort
Cape Canaveral
LC
: LC39B.
The countdown for Discovery's third launch attempt ended at the T-3 second mark
when on-board computers detected the failure of one of four sensors in main engine #2
which monitor the flow of hydrogen fuel to the engine. All of Discovery's main engines
were ordered replaced on the launch pad, delaying the Shuttle's fourth launch attempt
until September 12, 1993.
1993 Sep 12 11:45 -
Space Shuttle STS-51
Cape Canaveral
LC
: LC39B.
1993 Oct 18 14:53 -
Space Shuttle STS-58
Cape Canaveral
LC
: LC39B.
1993 Dec 2 9:27 -
Space Shuttle STS-61
Cape Canaveral
LC
: LC39B.
1994 Feb 3 12:10 -
Space Shuttle STS-60
Cape Canaveral
LC
: LC39A.
1994 Mar 4 13:53 -
Space Shuttle STS-62
Cape Canaveral
LC
: LC39B.
1994 Apr 9 11:05 -
Space Shuttle STS-59
Cape Canaveral
LC
: LC39A.
1994 Jul 8 16:43 -
Space Shuttle STS-65
Cape Canaveral
LC
: LC39A.
1994 Aug 18 -
Shuttle Endeavour Pad Abort
Cape Canaveral
LC
: LC39A.
The countdown for Endeavour's first launch attempt ended 1.9 seconds before liftoff
when on-board computers detected higher than acceptable readings in one channel of a
sensor monitoring the discharge temperature of the high pressure oxidizer turbopump in
main engine #3. A test firing of the engine at the Stennis Space Center in Mississippi on
September 2nd confirmed that a slight drift in a fuel flow meter in the engine caused a
slight increase in the turbopump's temperature. The test firing also confirmed a slightly
slower start for main engine #3 during the pad abort, which could have contributed to
the higher temperatures. After Endeavour was brought back to the Vehicle Assembly
Building to be outfitted with three replacement engines, NASA managers set October
2nd as the date for Endeavour's second launch attempt.
1994 Sep 9 22:22 -
Space Shuttle STS-64
Cape Canaveral
LC
: LC39B.
1994 Sep 30 11:16 -
Space Shuttle STS-68
Cape Canaveral
LC
: LC39A.
1994 Nov 3 16:59 -
Space Shuttle STS-66
Cape Canaveral
LC
: LC39B.
1995 Feb 3 5:22 -
Space Shuttle STS-63
Cape Canaveral
LC
: LC39B.
1995 Mar 2 6:38 -
Space Shuttle STS-67
Cape Canaveral
LC
: LC39A.
1995 Jun 27 19:32 -
Space Shuttle STS-71
Cape Canaveral
LC
: LC39A.
1995 Jul 13 13:41 -
Space Shuttle STS-70
Cape Canaveral
LC
: LC39A.
1995 Sep 7 15:09 -
Space Shuttle STS-69
Cape Canaveral
LC
: LC39A.
1995 Oct 20 13:53 -
Space Shuttle STS-73
Cape Canaveral
LC
: LC39B.
1995 Nov 12 12:30 -
Space Shuttle STS-74
Cape Canaveral
LC
: LC39A.
1996 Jan 11 9:41 -
Space Shuttle STS-72
Cape Canaveral
LC
: LC39B.
1996 Feb 22 20:18 -
Space Shuttle STS-75
Cape Canaveral
LC
: LC39B.
1996 Mar 22 8:13 -
Space Shuttle STS-76
Cape Canaveral
LC
: LC39B.
1996 May 19 10:30 -
Space Shuttle STS-77
Cape Canaveral
LC
: LC39B.
1996 Jun 20 14:49 -
Space Shuttle STS-78
Cape Canaveral
LC
: LC39B.
1996 Sep 16 8:54 -
Space Shuttle STS-79
Cape Canaveral
LC
: LC39A.
1996 Nov 19 19:55 -
Space Shuttle STS-80
Cape Canaveral
LC
: LC39B.
1997 Jan 12 9:27 -
Space Shuttle STS-81
Cape Canaveral
LC
: LC39B.
1997 Feb 11 8:55 -
Space Shuttle STS-82
Cape Canaveral
LC
: LC39A.
1997 Apr 4 19:20 -
Space Shuttle STS-83
Cape Canaveral
LC
: LC39A.
1997 May 15 8:07 -
Space Shuttle STS-84
Cape Canaveral
LC
: LC39A.
1997 Jul 1 18:02 -
Space Shuttle STS-94
Cape Canaveral
LC
: LC39A.
1997 Aug 7 14:41 -
Space Shuttle STS-85
Cape Canaveral
LC
: LC39A.
1997 Sep 26 2:34 -
Space Shuttle STS-86
Cape Canaveral
LC
: LC39A.
1997 Nov 19 19:46 -
Space Shuttle STS-87
Cape Canaveral
LC
: LC39B.
1998 Jan 23 2:48 -
Space Shuttle STS-89
Cape Canaveral
LC
: LC39A.
1998 Apr 17 18:19 -
Space Shuttle STS-90
Cape Canaveral
LC
: LC39B.
1998 Jun 2 22:06 -
Space Shuttle STS-91
Cape Canaveral
LC
: LC39A.
1998 Oct 29 19:19 -
Space Shuttle STS-95
Cape Canaveral
LC
: LC39B.
1998 Dec 4 8:35 -
Space Shuttle STS-88
Cape Canaveral
LC
: LC39A.
1999 May 27 10:49 -
Space Shuttle STS-96
Cape Canaveral
LC
: LC39B.
1999 Jul 23 4:31 -
Space Shuttle STS-93
Cape Canaveral
LC
: LC39B.
1999 Dec 20 0:50 -
Space Shuttle STS-103
Cape Canaveral
LC
: LC39B.
2000 Feb 11 17:43 -
Space Shuttle STS-99
Cape Canaveral
LC
: LC39A.
2000 May 19 10:11 -
Space Shuttle STS-101
Cape Canaveral
LC
: LC39A.
2000 Sep 8 12:45 -
Space Shuttle STS-106
Cape Canaveral
LC
: LC39B.
2000 Oct 11 23:17 -
Space Shuttle STS-92
Cape Canaveral
LC
: LC39A.
2000 Dec 1 3:06 -
Space Shuttle STS-97
Cape Canaveral
LC
: LC39B.
2001 Feb 7 23:13 -
Space Shuttle STS-98
Cape Canaveral
LC
: LC39A.
2001 Mar 8 11:42 -
Space Shuttle STS-102
Cape Canaveral
LC
: LC39B.
2001 Apr 19 18:40 -
Space Shuttle STS-100
Cape Canaveral
LC
: LC39A.
2001 Jul 12 9:03 -
Space Shuttle STS-104
Cape Canaveral
LC
: LC39B.
2001 Aug 10 21:10 -
Space Shuttle STS-105
Cape Canaveral
LC
: LC39A.
2001 Dec 5 22:19 -
Space Shuttle STS-108
Cape Canaveral
LC
: LC39B.
2002 Mar 1 11:22 -
Space Shuttle STS-109
Cape Canaveral
LC
: LC39A.
2002 Apr 8 20:44 -
Space Shuttle STS-110
Cape Canaveral
LC
: LC39B.
2002 Jun 5 21:22 -
STS-111
Cape Canaveral
LC
: LC39A.
2002 Oct 7 19:46 -
STS-112
Cape Canaveral
LC
: LC39B.
2002 Nov 24 0:49 -
STS-113
Cape Canaveral
LC
: LC39A.
2003 Jan 16 15:39 -
STS-107
Cape Canaveral
LC
: LC39A.
Bibliography:
McDowell, Jonathan,
Jonathan's Space Home Page
, Harvard University, 1997-present. Web Address when accessed:
Isakowitz, Steven J,,
International Reference to Space Launch Systems Second Edition
, AIAA, Washington DC, 1991.
Jenkins, Dennis R,,
Space Shuttle: The History of Developing the National Space Transportation System
, Motorbooks International, ISBN 0-9633974-4-3, 1996.
Isakowitz, Steven J, Hopkins, Joshua B, and Hopkins, Joseph P,
International Reference to Space Launch Systems Third Edition
, AIAA, Washington DC, 2000.
Contact
Mark Wade
with any corrections, additions, or comments.
Conditions for use of drawings, pictures, or other materials from this site.
This web site is sponsored by
SpaceBank.com
Last update 9 August 2003.
Definitions of Technical Terms
© Mark Wade, 2003 .